<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Piedmont Regional Wastewater Treatment Plant Renewable Water
<br />Resources, Piedmont, SC
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2013 2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Resident Inspector for a new 4 MGD, $45M Piedmont Regional WWTP. The treatment plant consisted of a headworks facility,
<br />daily and wet weather equalization basin, state-of-the-art membrane bioreactor, chemical storage, ultraviolet disinfection,
<br />and a plant drain pumping station. Key duties included daily civil, structural, and mechanical inspections, conformance of
<br />field work with Contract requirements, management of photo and daily project site work record documentation, and review
<br />of the monthly pay requisitions.
<br />F.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Middle Oconee Water Reclamation Facilities, Athens, GA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2011 2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Resident Inspector for the $50M Middle Oconee Water Reclamation Facilities. Duties included preparing reports on work
<br />completed, testing, material deliverables, coordinating with contractor’s supervisory personnel to correct areas of non-
<br />compliance; review of contractor’s monthly payment requisitions; managing the maintenance of project records; and
<br />obtaining clarification and interpretation of the contract plans and specifications.
<br />G.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West WTP Improvements, Phase IV, Boynton Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2010 2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Resident Inspector for numerous modifications and improvements, valued at approximately $5M, to the City’s West Water
<br />Treatment Plant. Improvements included the replacement of four membrane feed pumps; modification of nanofiltration
<br />membrane trains; demolition of the existing chlorine gas system and scrubber; new on-site sodium hypochlorite generation
<br />and feed system; brine storage and feed system; sodium hypochlorite bulk storage and feed system; installation of a
<br />new finished water pump system; new package standby generator; automation of the Palm Beach County Interconnect
<br />with piping modifications; computer based plant control system modifications; HVAC systems corresponding to the motor
<br />control centers, VFD room and on-site generation room; equipment pads and containment structures; a new 5,000 gallon
<br />diesel fuel storage tank; and associated yard piping and site improvements.
<br />H.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Water Treatment Facility, Sevierville, TN PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2005 2005
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Primary Resident Inspector for the construction of a new 5 MGD water treatment facility for the City of Sevierville with a
<br />construction value in excess of $17M. The treatment facility included a raw water pump station, 1600 LF sub-aqueous raw
<br />water intake pipeline, a treatment building including a membrane filtration system, finish water pumping and flow metering,
<br />2.5 MG pre-stressed concrete clearwell, and associated site, architectural, mechanical, electrical, and instrumentation and
<br />control work.
<br />I.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Clarksville Water Treatment Plant, Clarksville, TN PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2001 2001
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Resident Inspector responsible for all onsite resident inspection and coordination of general contractors operations with
<br />plant operations associated with the $10M improvements to the City of Clarksville’s 24 MGD Water Treatment Plant. The
<br />improvements included a new 36-inch raw water emergency intake pipe, a rapid mix system, a four-stage flocculation basin,
<br />modifications to the existing sedimentation basins, improvements to the existing filters and clearwells, improvements to
<br />the existing equalization basin, new solids holding tank, and converting to liquid chemical feed systems.
<br />J.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Echeconnee Creek Force Main & Pump Station, Macon, GA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />1999 1999
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Resident Inspector for the construction of a $4M wastewater pumping station with two 1,500 GPM vertical centrifugal
<br />pumps, including: a below-grade wet well and drywell; at-grade masonry electrical building; large-diameter piping; an
<br />odor control system; chemical feed system; an instrumentation system; heating, ventilation and air conditioning systems;
<br />low-voltage electrical switchboard and motor control center; variable speed drives; and an automatic stand-by generator.