Laserfiche WebLink
E-40Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Piedmont Regional Wastewater Treatment Plant Renewable Water <br />Resources, Piedmont, SC <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2013 2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Resident Inspector for a new 4 MGD, $45M Piedmont Regional WWTP. The treatment plant consisted of a headworks facility, <br />daily and wet weather equalization basin, state-of-the-art membrane bioreactor, chemical storage, ultraviolet disinfection, <br />and a plant drain pumping station. Key duties included daily civil, structural, and mechanical inspections, conformance of <br />field work with Contract requirements, management of photo and daily project site work record documentation, and review <br />of the monthly pay requisitions. <br />F. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Middle Oconee Water Reclamation Facilities, Athens, GA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Resident Inspector for the $50M Middle Oconee Water Reclamation Facilities. Duties included preparing reports on work <br />completed, testing, material deliverables, coordinating with contractor’s supervisory personnel to correct areas of non- <br />compliance; review of contractor’s monthly payment requisitions; managing the maintenance of project records; and <br />obtaining clarification and interpretation of the contract plans and specifications. <br />G. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />West WTP Improvements, Phase IV, Boynton Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2010 2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Resident Inspector for numerous modifications and improvements, valued at approximately $5M, to the City’s West Water <br />Treatment Plant. Improvements included the replacement of four membrane feed pumps; modification of nanofiltration <br />membrane trains; demolition of the existing chlorine gas system and scrubber; new on-site sodium hypochlorite generation <br />and feed system; brine storage and feed system; sodium hypochlorite bulk storage and feed system; installation of a <br />new finished water pump system; new package standby generator; automation of the Palm Beach County Interconnect <br />with piping modifications; computer based plant control system modifications; HVAC systems corresponding to the motor <br />control centers, VFD room and on-site generation room; equipment pads and containment structures; a new 5,000 gallon <br />diesel fuel storage tank; and associated yard piping and site improvements. <br />H. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Water Treatment Facility, Sevierville, TN PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2005 2005 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Primary Resident Inspector for the construction of a new 5 MGD water treatment facility for the City of Sevierville with a <br />construction value in excess of $17M. The treatment facility included a raw water pump station, 1600 LF sub-aqueous raw <br />water intake pipeline, a treatment building including a membrane filtration system, finish water pumping and flow metering, <br />2.5 MG pre-stressed concrete clearwell, and associated site, architectural, mechanical, electrical, and instrumentation and <br />control work. <br />I. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Clarksville Water Treatment Plant, Clarksville, TN PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2001 2001 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Resident Inspector responsible for all onsite resident inspection and coordination of general contractors operations with <br />plant operations associated with the $10M improvements to the City of Clarksville’s 24 MGD Water Treatment Plant. The <br />improvements included a new 36-inch raw water emergency intake pipe, a rapid mix system, a four-stage flocculation basin, <br />modifications to the existing sedimentation basins, improvements to the existing filters and clearwells, improvements to <br />the existing equalization basin, new solids holding tank, and converting to liquid chemical feed systems. <br />J. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Echeconnee Creek Force Main & Pump Station, Macon, GA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />1999 1999 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Resident Inspector for the construction of a $4M wastewater pumping station with two 1,500 GPM vertical centrifugal <br />pumps, including: a below-grade wet well and drywell; at-grade masonry electrical building; large-diameter piping; an <br />odor control system; chemical feed system; an instrumentation system; heating, ventilation and air conditioning systems; <br />low-voltage electrical switchboard and motor control center; variable speed drives; and an automatic stand-by generator. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2