Laserfiche WebLink
E-41Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Alejandro R. Montenegro, PE President; Sr. Geotechnical Engineer A. TOTAL B. WITH CURRENT FIRM <br />30+8 <br />15. FIRM NAME AND LOCATION (City and State) <br />GCES Engineering Services, LLC Hialeah Gardens, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />Master in Geotechnical Engineering, University of Detroit, Michigan, 1991 <br />BS, Civil Engineering, University of Detroit, Michigan, 1986 <br />FL Professional Engineer #59426 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certifications: FDOT CTQP Earthwork; FDOT CTQP Asphalt; FDOT CTQP Soils; ACI Soils; ACI Concrete; Member, Florida <br />Engineering Society, Miami Chapter Past President; Member, National Society of Professional Engineers; Member, Engineer <br />of the Year 2010-2011, Florida Engineering Society <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miami-Dade County Soil Exploration, Material Testing and Foundations <br />Contract, Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager. Responsible for managing Miami-Dade County Soil Exploration, Material Testing and Foundations. Prepared <br />geotechnical reports for roadway improvements, sewage pumping stations, force main pipes and buildings supported on <br />conventional shallow footings or on augercast pile foundations. Performed geotechnical evaluation for Miami-Dade County <br />Aviation at several runway airports. Managed this contract since 1999. <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />FDOT Northern Three Counties I-95 Intelligent Transportation System <br />(ITS) Deployment, Martin, St. Lucie & Indian River Counties, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Performed the geotechnical evaluation, directed the laboratory soils testing program and provided <br />recommendations for foundation system in connection with 24 DMS structures, 104 CCTV/VDS/VOIP concrete poles and <br />Master Hub structures. Performed embedment depth analysis for the CCTV/VDS/VOIP concrete poles in accordance with <br />FDOT procedures. The total fees were approximately $140,000. <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Turnpike SunNav ITS Phase IV – Segment I & II SR 91 (Florida’s <br />Turnpike) MP 155-307 , Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Conducted a subsurface exploration for the SunNav ITS Phase IV – Segment I & II project to obtain <br />subsurface soil data for the evaluation of foundation alternatives and to make design recommendations for the concrete <br />poles. The total fees were approximately $117,000. <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Proposed 8-inch Water Main, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2008 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Provided subsurface exploration that was performed along the water pipe main alignment. The subsurface <br />exploration included a general profile of the soil/rock conditions within the water pipe main alignment and geotechnical <br />parameters for excavation support. Construction recommendations for pipe installation, trench excavation, pipe bedding <br />and water control were provided. Total fees were approximately $7,000. <br />E. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Water Main Extension Little River Drive, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2007 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Performed the geotechnical exploration of the of the Water Main Extension Little River Drive project. The <br />scope included drilling borings, subsurface conditions, soil/rock boring profile within the water extension alignment and <br />geotechnical parameters for excavation support. Construction recommendations for pipe installation, trench excavation, <br />pipe bedding and water control were provided. Total fees were approximately $7,000.