|
E-41Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Alejandro R. Montenegro, PE President; Sr. Geotechnical Engineer A. TOTAL B. WITH CURRENT FIRM
<br />30+8
<br />15. FIRM NAME AND LOCATION (City and State)
<br />GCES Engineering Services, LLC Hialeah Gardens, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />Master in Geotechnical Engineering, University of Detroit, Michigan, 1991
<br />BS, Civil Engineering, University of Detroit, Michigan, 1986
<br />FL Professional Engineer #59426
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Certifications: FDOT CTQP Earthwork; FDOT CTQP Asphalt; FDOT CTQP Soils; ACI Soils; ACI Concrete; Member, Florida
<br />Engineering Society, Miami Chapter Past President; Member, National Society of Professional Engineers; Member, Engineer
<br />of the Year 2010-2011, Florida Engineering Society
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Miami-Dade County Soil Exploration, Material Testing and Foundations
<br />Contract, Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Manager. Responsible for managing Miami-Dade County Soil Exploration, Material Testing and Foundations. Prepared
<br />geotechnical reports for roadway improvements, sewage pumping stations, force main pipes and buildings supported on
<br />conventional shallow footings or on augercast pile foundations. Performed geotechnical evaluation for Miami-Dade County
<br />Aviation at several runway airports. Managed this contract since 1999.
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />FDOT Northern Three Counties I-95 Intelligent Transportation System
<br />(ITS) Deployment, Martin, St. Lucie & Indian River Counties, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager. Performed the geotechnical evaluation, directed the laboratory soils testing program and provided
<br />recommendations for foundation system in connection with 24 DMS structures, 104 CCTV/VDS/VOIP concrete poles and
<br />Master Hub structures. Performed embedment depth analysis for the CCTV/VDS/VOIP concrete poles in accordance with
<br />FDOT procedures. The total fees were approximately $140,000.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Turnpike SunNav ITS Phase IV – Segment I & II SR 91 (Florida’s
<br />Turnpike) MP 155-307 , Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2009
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager. Conducted a subsurface exploration for the SunNav ITS Phase IV – Segment I & II project to obtain
<br />subsurface soil data for the evaluation of foundation alternatives and to make design recommendations for the concrete
<br />poles. The total fees were approximately $117,000.
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Proposed 8-inch Water Main, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager. Provided subsurface exploration that was performed along the water pipe main alignment. The subsurface
<br />exploration included a general profile of the soil/rock conditions within the water pipe main alignment and geotechnical
<br />parameters for excavation support. Construction recommendations for pipe installation, trench excavation, pipe bedding
<br />and water control were provided. Total fees were approximately $7,000.
<br />E.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Water Main Extension Little River Drive, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2007
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager. Performed the geotechnical exploration of the of the Water Main Extension Little River Drive project. The
<br />scope included drilling borings, subsurface conditions, soil/rock boring profile within the water extension alignment and
<br />geotechnical parameters for excavation support. Construction recommendations for pipe installation, trench excavation,
<br />pipe bedding and water control were provided. Total fees were approximately $7,000.
|