My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Engineering & Inspection (CEI) Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Construction Engineering & Inspection (CEI) Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:15:47 AM
Creation date
8/21/2020 10:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-52Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />F. Example projects which best illustrate proposed team’s qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />6 <br />21. TITLE AND LOCATION (City and State) <br />Miramar Infrastructure Improvements & Service Conversions, <br />Phase III, Miramar, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2019 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />City of Miramar Robin Bain, PE (Former Assistant <br />Director of Utilities) <br />623.217.7202 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. Firms from section involved with this project <br />A. <br />(1) FIRM NAME (2) FIRM LOCATION (City & State) (3) ROLE <br />CES Consultants, Inc.Miami, Pembroke Pines, & <br />Tampa, FL <br />Civil Engineering, Utilities & Roadway Design, <br />QA/QC, Construction Services <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />The Miramar Infrastructure Improvements & Service Conversions, Phase III project involved <br />the design and construction oversight of over 72,000 LF of residential water main, including a <br />100 LF horizontal directional drilling operation. The design included a new 8-inch PVC and DIP <br />water main, new water services, new water meter boxes and complete roadway restoration. <br />The roadway restoration includes a full depth trench restoration, edge of pavement to edge of <br />pavement milling, and a final overlay, and complete striping for each street. <br />During our design effort, we realized that the City lacked accurate and complete as-builts for <br />the sanitary sewer system. As part of our effort, we provided all sanitary sewer details to the <br />City GIS department to allow them to update their utility records. <br />Cost <br />$6M (Estimate was $8M) <br />Completed within <br />Budget & schedule <br />Yes <br />Key Features <br />Civil Engineering Design <br />New Water Distribution System <br />Mains <br />New Water Services & Water <br />Meter Boxes <br />Sanitary Sewer System <br />As-Builts <br />Utility Coordination <br />Permitting <br />Interagency Coordination <br />Construction Administration & <br />Inspections <br />Roadway Resurfacing & <br />Reconstruction <br />Signage & Street Markings <br />Horizontal Directional Drilling R/W LINE <br />R/W LINE R/W LINE <br />R/W LINE79377933792979257921791779137909 7905 7901 <br />7900790479087912791679207924792879327936 <br />R/W LINE <br />R/W LINE <br />R/W LINE <br />R/W LINE <br />7816 <br />7809781378177821782578297833783778417845 <br />78087820782478287832783678407844 <br />0 20 40 60 <br />1"=20'
The URL can be used to link to this page
Your browser does not support the video tag.