Laserfiche WebLink
E-53Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />F. Example projects which best illustrate proposed team’s qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />7 <br />21. TITLE AND LOCATION (City and State) <br />NW 12th Avenue Force Main Design, North Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />City of North Miami Chuks Okereke 305.895.9838 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. Firms from section involved with this project <br />A. <br />(1) FIRM NAME (2) FIRM LOCATION (City & State) (3) ROLE <br />CES Consultants, Inc.Miami, Pembroke Pines, & <br />Tampa, FL <br />Civil Engineering, Roadway & Utilities Design, <br />Hydraulic Modeling, Construction Services <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br />The City of North Miami retained CES Consultants to prepare a hydraulic model and to provide <br />hydraulic analysis, design, permitting, and construction services for 10,500 LF of 12-inch <br />replacement force main along NW 12th Avenue, extending from NW 95th Street to NW 125th <br />Street. The new pipeline connects to the MDWASD 48-inch force main leading to the North <br />District WWTP. <br />The project replaces aging asbestos-cement and cast iron force mains with corrosion resistant <br />PVC pipe. Twenty-one private pump station force main connections and two City pump station <br />connections required relocation and reconnection to the new force main, as well as planning for <br />uninterrupted service during construction. <br />The design comprised one force main with capacity to handle the flows from the two existing <br />force mains and a reserve capacity for future development. The design incorporated plan and <br />profile sheets, soft digs to identify existing utilities with conflicting as-built data, specifications <br />and permits. <br />Cost <br />$3M <br />Completed within <br />Budget & schedule <br />Yes <br />Key Features <br />Civil Engineering Design <br />Force Mains <br />Roadway Reconstruction <br />Wastewater Treatment Plant <br />Connection <br />Pump Station Connections <br />Maintenance of Operations/ <br />Service <br />Future Capacity Planning <br />Soft Digs <br />Utility Coordination <br />Permitting <br />Interagency Coordination <br />MATCH LINE STA. 34+00 SEE SHEET P-08MATCH LINE STA. 40+00 SEE SHEET P-102 <br />4 <br />6 <br />8 <br />10 <br />12 <br />0 <br />2 <br />4 <br />6 <br />8 <br />10 <br />12 <br />0