Laserfiche WebLink
E-54Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />F. Example projects which best illustrate proposed team’s qualifications for this contract <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />8 <br />21. TITLE AND LOCATION (City and State) <br />MDWASD Pump Station Improvement Program (Phase II) & <br />Associated Force Mains, Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />Miami-Dade County Water & Sewer Dept.Reinaldo J. Rivera, PE 305.446.7450 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Miami-Dade County Water and Sewer Department (WASD), in an effort to comply with <br />the 2013 Consent Decree and improve operation of its wastewater collection system to achieve <br />compliance, established the Pump Station Improvement Program. Under this program, WASD <br />will repair or replace over 140 existing and non-compliant wastewater pump stations. The <br />improvements vary from pump upgrades to complete pump station and force main upgrades. <br />CES is providing the inspection/evaluation, analysis and design for 27 sanitary sewer lift stations <br />ranging from 20 HP to 60 HP and associated force mains. Our team is providing full design <br />services, which includes surveying, geotechnical engineering, civil engineering, mechanical <br />engineering, structural engineering, and electrical engineering. The main complexities of <br />these projects and designs are the accelerated schedules required to meet the Consent Decree <br />schedules. The aggressive schedule requires efficient project management and effective project <br />controls. Some of the projects included in the PSIP Task Orders are: <br /> »Design of Pump Station No. 609: Analyzed and designed the upgrades to PS 609. The <br />station analysis included reviewing SCADA data, hydraulic information provided by WASD, <br />as-built information, and site inspections. With this data, it was concluded that this <br />station required resurfacing and recoating the inside of the existing wet well, new 40 HP <br />pumps, and a new motor connection box. <br /> »Design of Pump Station No. 449: Analyzed and designed the upgrades to PS 449. The <br />station analysis included reviewing SCADA data, hydraulic information provided by WASD, <br />Awards <br />2019 Cuban American <br />Association of Civil Engineers <br />Project of the Year <br />2018-2019 American Society of <br />Civil Engineers Project of the <br />Year Category III <br />Cost <br />$27M+ <br />Completed within <br />Budget & schedule <br />To Date, Yes <br />Key features <br />Civil Engineering & Design <br />Inspection/Evaluation & <br />Analysis <br />Consent Decree Program <br />Accelerated Schedules <br />Lift/Pump Stations <br />Force Mains <br />Utility Relocation <br />Sanitary Sewer Collection <br />System <br />Mechanical, Electrical & <br />Structural Engineering <br />Sidewalk/Curbing <br />SUE/Utility Coordination <br />Public Involvement <br />Landscaping <br />Interagency Coordination