My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Engineering & Inspection (CEI) Svcs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Construction Engineering & Inspection (CEI) Svcs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:15:47 AM
Creation date
8/21/2020 10:14:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-62Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />4. CEI for L-8 Dupuis Culvert Replacements, Martin County, FL Completion: 2019 <br />CES provided construction management services for the L-8 Dupuis Culvert Replacements of the G-261, G-262 and G-263 <br />Structures. The structures consist of metal culverts through a Federal levee. These culverts had deteriorated and needed to be <br />removed and replaced in kind. The work was in a very remote area East of Lake Okeechobee along the L-8 Canal. <br />CES provided resources to support the District PM with construction management <br />services, including on-site representation, project documentation control, <br />running meetings, and providing signed and sealed Construction Certificates of <br />Completion. <br />While providing construction management services for this project, the <br />methodology was to use the District-provided Primavera software as a document <br />tracking and control system. This includes tracking submittals, Requests for <br />Information, payment applications, meeting minutes and the inspector’s daily <br />reports. <br />QA/QC was handled by CES Project Manager Bud Goblisch, who has over 40 <br />years of experience in the construction management field. Weekly calls to the <br />field representative were held and documentation review was completed on a <br />regular basis to ensure that the procedures were being followed. Timely reviews <br />and quality technical comments were essential to the project team efforts. <br />CES Project Manager Bud Goblisch worked to ensure the work progressed <br />according to schedule and budget and established clear lines of responsibility and <br />communication with all project participants. Scheduling and document tracking <br />and control software was utilized throughout, allowing the District PM to keep up with project progress and issues. CES was <br />tasked with ensuring that the construction contractor stayed on budget and schedule; the project was completed on schedule <br />and budget. <br />5. CEI for PC Culverts Inspections, Hendry, Miami-Dade & Broward Counties, FL Completion: 2019 <br />CES has provided construction phase support for the FY 2017 and 2018 PC Culverts construction projects located in Hendry, <br />Miami-Dade and Broward Counties as a subconsultant to Hazen. The PC Culverts projects include the removal or replacement of <br />culverts along canals. When called upon by the District, CES provides on-site inspection of the work performed by the District <br />and coordinates with the geotechnical subcontractor for soils testing. When a site is completed, CES reviews the as-built <br />drawings by the District and if correct, signs and seals the Construction Certificate of Completion for the site. <br />This assignment is on an “as-needed” basis as requested by the District. CES has been very responsive in meeting the needs of <br />the District and has been under budget each of the years we have performed the work.
The URL can be used to link to this page
Your browser does not support the video tag.