My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB D: PROJECT APPROACH AND UNDERSTANDING <br /> <br />▪ During the field data collection and office preparation of the survey, daily evaluations of the <br />collected information will be reviewed to assure accuracy and conformance to the scope. As a <br />part of this process, the project will be analyzed and tracked to assure the ability to conform to <br />the project scope, cost and schedule. <br />▪ Upon completion of the project survey, an independent Project Lead Surveyor employed by our <br />firm will perform a Quality Assurance and Quality Control review of the final product vs. the City’s <br />Detailed Statement of Work, City Standards, the proposed scope of services, Florida State <br />Statute Chapter 472 - Land Surveying and Mapping, Florida Standards of Practice for Land <br />Surveying under Florida Administrative Code Chapter 5J-17 and any other applicable City Codes. <br />▪ All during the survey process, the Project Lead Surveyor will maintain close communications with <br />survey staff and sub-consultants, managing the project in order to immediately solve any issues <br />that may arise as to schedule, costs, and deliverables. This will assure that the Project Lead <br />Surveyor can communicate regularly and accurately with City project manager the status of t he <br />project at any given time and guarantee quality products delivered on time as required by the <br />Work Order. <br />▪ The final steps will be to deliver the project survey to the City in the required format(s) for review. <br />If there are any comments during the review by the City, address those issues immediately and <br />resubmit. <br />All of the surveys involving field crews and sub-consultants will follow the above procedures. The <br />types of survey and survey tasks will include: <br />Topographic Survey, Record As-Built Survey, Specific Purpose Survey <br />We pride ourselves being on the cutting edge of technology when deciding on which data collection <br />method(s) to use when addressing the needs of our clients as to level of accuracy, cost and <br />timeframe when proposing and executing a project. For these types of surveys, we use conventional <br />data collection methods for smaller projects to be cost effective. For medium and large-scale tasks, <br />we will analyze which method of data collection will be most efficient. These innovative methods <br />would include GPS (Global Positioning System) Fast Static Control Survey and data collection, 3D <br />fixed base laser scanning, mobile LiDAR scanning, aerial photogrammetry, and aerial LiDAR <br />scanning. We have the capability to combine these diverse data acquisition methods resulting in <br />quality and cost-effective products. <br />Sketch & Descriptions and Preparation of Easements <br />Our procedures for preparing sketch & descriptions and easements are virtually identical but <br />dependent on the type of document required. These items are quite similar where a sketch & <br />description could include any type of property, and easements would include a sketch & description <br />of a portion of a certain property covering a utility, access, sidewalk or other type of improvement. <br />The procedure would include reviewing the City’s work authorization; determining the purpose of the <br />sketch & description, research of the property to determine ownership limits which would also <br />establish the limits of the sketch & description and/or easement. All sketch & descriptions are <br />prepared using AutoCAD Civil 3D software. We also strive to prepare the base calculations and final <br />document in the state plane coordinate system thus providing a seamless importation into current <br />databases. <br />D | Page 12
The URL can be used to link to this page
Your browser does not support the video tag.