My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB D: PROJECT APPROACH AND UNDERSTANDING <br /> <br />▪ Prepare project completion certification forms and <br />applications and submit all other necessary <br />documents to the governmental authorities to <br />accept the project <br />▪ Sign & seal final record drawings <br />▪ Prepare submittal package to the City for final <br />approval <br />Record drawings will be prepared and submitted to <br />City of Sunny Isles Beach staff (in AutoCAD format) for <br />their use to incorporate into the City data base. The <br />Craven Thompson Surveying & GIS Department will <br />prepare the record drawings in conjunction with the <br />contractor. <br />Surveying and Mapping Specific Projects <br />Craven Thompson proposes the following approach to survey tasks to be performed for the City: <br />▪ We will perform preliminary research of subject properties to determine exact limits, available <br />survey data on and near the site, and assign a Project Lead Surveyor best suited for the type of <br />survey requested. <br />▪ Dependent on the complexity of the Work Authorization and if required, we will meet with City <br />staff either in person, by phone, or through e-mail to discuss details of the statement of work, <br />project schedule, City’s cost limitations and deliverables. <br />▪ The Project Lead Surveyor will then visit the site to review existing field conditions and note any <br />issues that may arise as to access, safety, available horizontal and vertical control on or near the <br />site, obstructions and unique conditions that will affect the cost and schedule in completion of <br />the requested task. <br />▪ We will then prepare and submit a proposal that includes a detailed level of effort, project and <br />staffing schedules, firm fixed price based on proposed labor effort applying the pre-determined <br />rate schedule, project completion date and deliverables. <br />▪ If applicable, innovative and alternative survey methods will be proposed to give the City options <br />as to possible reduction of the project schedule and costs. Some of these methods would <br />include GPS (Global Positioning System) Fast Static Control Survey and data collection, and 3D <br />fixed base Laser Scanning. <br />▪ Once the City has reviewed our proposal, we fine tune the labor effort, cost and schedule, and <br />submit a revised proposal for approval and work authorization. <br />All survey projects will adhere to the following Methodology: <br />▪ Work will begin immediately after receipt of the work authorization. The Project Lead Surveyor <br />will compile any additional survey data required to perform office calculations and materials for <br />the use of field and office staff to perform the tasks as outlined in the work authorization. A <br />meeting will then be held with staff to review the project’s details, objectives and schedule. <br />D | Page 11
The URL can be used to link to this page
Your browser does not support the video tag.