My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR QUALIFICATIONS NO. 20-07-01 <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br />TAB E: QUALIFICATION INFORMATION & ASSIGNED PERSONNEL <br /> <br />In Aventura, for projects such as NE 29th Place, NE 185th Street Left Turn Lane Extension, NE 191st <br />Street Drainage and numerous milling & resurfacing projects we have received RER-DERM drainage <br />approvals. We have provided NPDES Annual Reporting services to the City since 2002. We have <br />submitted and obtained approvals through FDEP. <br />This is an example of our most recent experience with permitting through governmental entities in <br />Miami-Dade County. We are very familiar with the processes and personnel of these entities. <br />ABILITY TO COMPLETE PROJECTS ON TIME AND WITHIN BUDGET <br />Craven Thompson has managed a multitude of infrastructure projects for various municipalities. The <br />following represents our ability to control costs on projects through our project management and the <br />quality of our documents/work product and our ability to meet schedules: <br />▪ Utility Analysis Zone (UAZ) 310, Broward County, Florida <br />Budget: $10,500,000.00, Original Bid Amount: $8,724,121.00 <br />Final Contract Amount: $8,731,469.00 (Cost 77% of budget and less than 0.001% over the <br />original contract amount) <br />Scheduled Completion Date: November 2016, Actual Completion Date: September 2016 <br />▪ Lake Worth 2” Watermain Replacement – Phase 3, Lake Worth, Florida <br />Budget: $3,600,000.00, Original Bid Amount: $3,455,350.00 <br />Final Contract Amount: $3,455,350.00 (Cost 96% of budget and completed at the original <br />contract amount) <br />Scheduled Completion Date: May 2019, Actual Completion Date: May 2019 <br />▪ Plantation Gardens Phase IIB Watermain, Plantation, Florida <br />Budget: $2,601,000.00, Original Bid Amount: $2,290,631.00 <br />Final Contract Amount: $2,005,104.00 (Cost 77% of budget and completed 12% under original <br />contract amount) <br />Scheduled Completion Date: June 2017, Actual Completion Date: March 2017 <br />▪ Utility Analysis Zone (UAZ) 308, Broward County, Florida <br />Budget: $7,800,000.00, Original Bid Amount: $6,488,392.00 <br />Final Contract Amount: $6,249,174.96 (Cost 80% of budget and less than 4% under the original <br />contract amount) <br />Scheduled Completion Date: February 2013, Actual Completion Date: February 2013 <br />Craven Thompson has provided accurate estimating of construction costs which is a critical aspect in <br />appropriating proper funding for these projects. Craven Thompson has prepared over twenty-six (26) <br />Water and Sanitary Bid Packages since 1993. In reviewing the Opinion of Probable Costs and actual <br />Bid Prices for all twenty-six (26) Bid Packages, we have estimated, on average, the construction costs <br />to within 6% (under) of the actual Bid Cost. <br /> <br /> <br />E | Page 12
The URL can be used to link to this page
Your browser does not support the video tag.