Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Patrick J. Gibney, P.E. <br />13. ROLE IN THIS CONTRACT <br />Client Contact/Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />33 <br />b. WITH CURRENT FIRM <br />27 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Rutgers, The State University, Bachelor of Science, <br />Civil Engineering (1987) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer - Florida No. 49428 (1995) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Civil Engineers, FDOT Pre-Qualified Roadway Construction Engineering Inspection <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />NE 38th Street Complete Streets Project <br />Oakland Park, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Gibney was project manager for this Complete Streets Project which involved providing surveying, civil <br />engineering, and landscape architectural services for the design and permitting of approximately 0.90 miles of <br />roadway improvements. Construction included a complete storm drainage system, a roundabout to replace an <br />existing traffic signal, traffic calming devices, landscape and streetscape enhancement, utility <br />coordination/relocations, and full roadway reconstruction. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />North County Neighborhood Improvement Project, NE Quadrant <br />Bid Package 11, Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 - 2011 <br />CONSTRUCTION (If applicable) <br />2011 - 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Gibney managed this project. NCNIP BP 11 included over 14,777 LF of storm sewer, 12,993 LF of exfiltration <br />trench, 64,000 LF of water main, 553 water services 49,700 LF of reclaimed water main, 796 reclaimed water <br />services, 43,805 LF of gravity sewer main, 750 sewer laterals, lift station, and 1,630 LF of force main. Main line <br />pipe sizes ranged from 4” to 48” in diameter. The project also included over 50,688 LF linear feet of new roadway <br />construction, sidewalks, driveway aprons, and sodded swales. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Polk Street Boat Ramps <br />Hollywood, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 - 2019 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Improvements to the site to improve drainage and aesthetics included: ramp reconstruction, 259 linear feet of 18” <br />diameter RCP storm sewer, 201 linear feet of exfiltration trench, the raising of160 linear feet of seawall, the <br />installation of handicapped ramps, the addition of 43 new trees, the relocation of 7 existing trees, the addition of <br />2,118 new shrubs and the addition of 5 new parking lot lighting standards and fixtures. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />ADA Transition Plan, <br />North Miami Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />Not Applicable <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The Plan was intended to: Identify physical obstacles that limit the accessibility of facilities to individuals with <br />disabilities; Describe the methods to be used to make facilities accessible; Provide a schedule for making the <br />access modifications; Identify the public officials responsible for implementation of the Transition Plan. The <br />objective of this document is to provide an ADA Transition Plan for the City of North Miami Beach’s public rights-of- <br />way. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />NW 10th Avenue Roadway & Streetscape Project <br />Oakland Park, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />2020 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager - The scope of work included design of 2,900 linear feet of roadway, landscaping, irrigation, photo- <br />metrics, coordination, drainage, LAP services, etc. for the NW 10th Avenue Roadway Project from Park Lane West <br />(NW 33rd Street) to Prospect Road, including preparation of contract documents and permitting. <br /> <br />E | Page 15