<br /> STANDARD FORM 330
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Patrick J. Gibney, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Client Contact/Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />33
<br />b. WITH CURRENT FIRM
<br />27
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Rutgers, The State University, Bachelor of Science,
<br />Civil Engineering (1987)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer - Florida No. 49428 (1995)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Civil Engineers, FDOT Pre-Qualified Roadway Construction Engineering Inspection
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 38th Street Complete Streets Project
<br />Oakland Park, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Gibney was project manager for this Complete Streets Project which involved providing surveying, civil
<br />engineering, and landscape architectural services for the design and permitting of approximately 0.90 miles of
<br />roadway improvements. Construction included a complete storm drainage system, a roundabout to replace an
<br />existing traffic signal, traffic calming devices, landscape and streetscape enhancement, utility
<br />coordination/relocations, and full roadway reconstruction.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />North County Neighborhood Improvement Project, NE Quadrant
<br />Bid Package 11, Pompano Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009 - 2011
<br />CONSTRUCTION (If applicable)
<br />2011 - 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Gibney managed this project. NCNIP BP 11 included over 14,777 LF of storm sewer, 12,993 LF of exfiltration
<br />trench, 64,000 LF of water main, 553 water services 49,700 LF of reclaimed water main, 796 reclaimed water
<br />services, 43,805 LF of gravity sewer main, 750 sewer laterals, lift station, and 1,630 LF of force main. Main line
<br />pipe sizes ranged from 4” to 48” in diameter. The project also included over 50,688 LF linear feet of new roadway
<br />construction, sidewalks, driveway aprons, and sodded swales.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Polk Street Boat Ramps
<br />Hollywood, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 - 2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Improvements to the site to improve drainage and aesthetics included: ramp reconstruction, 259 linear feet of 18”
<br />diameter RCP storm sewer, 201 linear feet of exfiltration trench, the raising of160 linear feet of seawall, the
<br />installation of handicapped ramps, the addition of 43 new trees, the relocation of 7 existing trees, the addition of
<br />2,118 new shrubs and the addition of 5 new parking lot lighting standards and fixtures.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />ADA Transition Plan,
<br />North Miami Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />Not Applicable
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The Plan was intended to: Identify physical obstacles that limit the accessibility of facilities to individuals with
<br />disabilities; Describe the methods to be used to make facilities accessible; Provide a schedule for making the
<br />access modifications; Identify the public officials responsible for implementation of the Transition Plan. The
<br />objective of this document is to provide an ADA Transition Plan for the City of North Miami Beach’s public rights-of-
<br />way.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />NW 10th Avenue Roadway & Streetscape Project
<br />Oakland Park, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager - The scope of work included design of 2,900 linear feet of roadway, landscaping, irrigation, photo-
<br />metrics, coordination, drainage, LAP services, etc. for the NW 10th Avenue Roadway Project from Park Lane West