|
<br /> STANDARD FORM 330
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Timothy J. Hall, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Civil Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />31
<br />b. WITH CURRENT FIRM
<br />13
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />University of Maryland (Structural Emphasis, Bachelor of
<br />Science, Civil Engineering (1987)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer - Florida No. 50588 (1996)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Royal Palm Estates Neighborhood Drainage Improvements
<br />Plantation, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 - 2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager - Improvements included: 12,080 linear feet of swale re-grading, the installation of 4,093 linear feet of
<br />15” diameter storm sewer, 2,483 linear feet of 18” diameter storm sewer, 4,691 linear feet of 24” diameter storm
<br />sewer, 371 linear feet of 30” diameter storm sewer, the removal and replacement of 3 outfalls, the installation of 154 –
<br />30” diameter ADS drainage structures, 5 - type “C” catch basins, 5 – 4’ diameter drainage structures, and 10 – 5’
<br />diameter drainage structures. The project also included the dredging and re-shaping of 5,078 linear feet of existing
<br />canals. Restoration of the disturbed right-of-way areas was also included.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Plantation Isles Neighborhood Drainage Improvements
<br />Plantation, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 - 2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager - Improvements included: 3,150 linear feet of swale re-grading, the installation of 2,217 linear feet of
<br />15” diameter storm sewer, 471 linear feet of 18” diameter storm sewer, 429 linear feet of 24” diameter storm sewer,
<br />576 linear feet of 30” diameter storm sewer, 828 linear feet of 36” diameter storm sewer, 321 linear feet of 42”
<br />diameter storm sewer, 101 linear feet of 48” diameter storm sewer, 116 linear feet of 72” diameter storm sewer, the
<br />removal & replacement of 5 outfalls, and 160 – 30” diameter ADS drainage structures. The project also included C.I.P.P.
<br />lining & pipe bursting.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Park East Neighborhood Drainage Improvements
<br />Plantation, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 - 2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager - Improvements included: 1,500 linear feet of swale re-grading, the installation of 4,000 linear feet of
<br />15” diameter storm sewer, 1,600 linear feet of 18” diameter storm sewer, 3,400 linear feet of 24” diameter storm
<br />sewer, 1,600 linear feet of 30” diameter storm sewer, 1,100 linear feet of 36” diameter storm sewer, 900 linear feet of
<br />42” diameter storm sewer, 750 linear feet of 48” diameter storm sewer, 370 linear feet of 54” diameter storm sewer the
<br />removal & replacement of 6 outfalls, and 155 – 30” diameter ADS drainage structures. The project also included C.I.P.P.
<br />lining, and the conversion of 2,633 linear feet of existing canal into a piped system.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Plantation Golf Estates Neighborhood Drainage Improvements
<br />Plantation, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 - 2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager -Improvements included: 1,000 linear feet of swale re-grading, 913 linear feet of storm pipe removal,
<br />the installation of 532 linear feet of 15” diameter storm sewer, 352 linear feet of 18” diameter storm sewer, 29 linear
<br />feet of 72” diameter storm sewer, the dredging of 4,875 linear feet of existing canal, the installation of 28 – 30” ADS
<br />drainage structures. Restoration of the disturbed right-of-way areas is included.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Historical Area Neighborhood Drainage Improvements
<br />Plantation, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 - 2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager - Improvements included: 1,000 linear feet of swale re-grading, the installation of 245 linear feet of 15”
<br />diameter storm sewer, 415 linear feet of 18” diameter storm sewer, 616 linear feet of 24” diameter storm sewer, 2
<br />outfall replacements, the installation of 4 – 30” diameter ADS drainage structures, and one 5’ diameter drainage
<br />structure.
<br />
<br />E | Page 16
|