|
<br /> STANDARD FORM 330
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Douglas R. Taylor, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Civil Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />36
<br />b. WITH CURRENT FIRM
<br />9
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />University of Illinois (UIUC)
<br />Bachelor of Civil Engineering (1984)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer - Florida No. 50569 (1996)
<br />Professional Engineer - IL No. 44542 (1988)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />- FEMA ICS 100,200,700,800 - FEMA G300, G400) - Florida Green Building Council - Florida Redevelopment
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />SW 36th Street Improvements
<br />Davie, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project consisted of roadway, roadway drainage, utility and landscape/hardscape improvements to SW 36th
<br />Street in Davie, Florida. The existing roadway section was approximately 22’ wide and was expanded to 25’ wide.
<br />SW 36th Street was designed as a two (2) lane divided boulevard from College Avenue to SW 76th Avenue within a
<br />75-foot public right-of-way width.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Kimberly Boulevard Complete Streets Project
<br />North Lauderdale, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2017 2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager for the design and permitting of 1.2 miles of roadway, bicycle lane, median enhancements, a
<br />roundabout, landscaping, hardscape and lane reduction for an existing four-lane roadway subject to speeding and
<br />traffic accidents between autos, pedestrians, and bicyclists. Craven Thompson is providing survey, civil
<br />engineering, landscape architecture and construction administration and inspection.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miramar Historic Area Complete Streets Phase II
<br />Miramar, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2017 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Craven Thompson & Associates was selected by the City of Miramar to survey, design, permit, and provide
<br />construction services for Phase II of their Historical Area Complete Streets Project. The project included six (6)
<br />streets with the following improvements: sidewalks, ADA ramps, crosswalks, pedestrian level lighting, landscaping
<br />and hardscape.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />City of Miami Gardens Livable Neighborhood Improvement
<br />Project – Vista Verde Phases 1A & 1B Miami Gardens, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2013 2014 - 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The Vista Verde Phase 1A & 1B Improvements are located within the City of Miami Gardens bordered by NW 213th
<br />Street to the north, NW 207th Lane to the south, NW 37th Avenue (Douglas Road) to the east, and a vacant plot of
<br />land to the west. The project included 1,900 LF of roadway and 1,900 LF of storm sewer and full right-of-way
<br />restoration. The project was permitted through Miami-Dade RER (DERM).
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miami Springs City-Wide ADA Ramps
<br />Miami Springs, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 2015 - 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Taylor assisted with the design and permitting of new and replacement ADA ramps throughout the City. The
<br />project was funded through the legislative appropriation process. The project included field evaluation of
<br />intersections throughout the City to determine the location of non-conforming or missing ADA ramps. Craven
<br />Thompson developed a set of construction plans for installation of the ramps per FDOT standards.
<br />
<br />E | Page 17
|