Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Douglas R. Taylor, P.E. <br />13. ROLE IN THIS CONTRACT <br />Civil Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />36 <br />b. WITH CURRENT FIRM <br />9 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />University of Illinois (UIUC) <br />Bachelor of Civil Engineering (1984) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer - Florida No. 50569 (1996) <br />Professional Engineer - IL No. 44542 (1988) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />- FEMA ICS 100,200,700,800 - FEMA G300, G400) - Florida Green Building Council - Florida Redevelopment <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />SW 36th Street Improvements <br />Davie, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The project consisted of roadway, roadway drainage, utility and landscape/hardscape improvements to SW 36th <br />Street in Davie, Florida. The existing roadway section was approximately 22’ wide and was expanded to 25’ wide. <br />SW 36th Street was designed as a two (2) lane divided boulevard from College Avenue to SW 76th Avenue within a <br />75-foot public right-of-way width. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Kimberly Boulevard Complete Streets Project <br />North Lauderdale, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017 2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager for the design and permitting of 1.2 miles of roadway, bicycle lane, median enhancements, a <br />roundabout, landscaping, hardscape and lane reduction for an existing four-lane roadway subject to speeding and <br />traffic accidents between autos, pedestrians, and bicyclists. Craven Thompson is providing survey, civil <br />engineering, landscape architecture and construction administration and inspection. <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miramar Historic Area Complete Streets Phase II <br />Miramar, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Craven Thompson & Associates was selected by the City of Miramar to survey, design, permit, and provide <br />construction services for Phase II of their Historical Area Complete Streets Project. The project included six (6) <br />streets with the following improvements: sidewalks, ADA ramps, crosswalks, pedestrian level lighting, landscaping <br />and hardscape. <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City of Miami Gardens Livable Neighborhood Improvement <br />Project – Vista Verde Phases 1A & 1B Miami Gardens, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 2014 - 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The Vista Verde Phase 1A & 1B Improvements are located within the City of Miami Gardens bordered by NW 213th <br />Street to the north, NW 207th Lane to the south, NW 37th Avenue (Douglas Road) to the east, and a vacant plot of <br />land to the west. The project included 1,900 LF of roadway and 1,900 LF of storm sewer and full right-of-way <br />restoration. The project was permitted through Miami-Dade RER (DERM). <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miami Springs City-Wide ADA Ramps <br />Miami Springs, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2015 - 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Taylor assisted with the design and permitting of new and replacement ADA ramps throughout the City. The <br />project was funded through the legislative appropriation process. The project included field evaluation of <br />intersections throughout the City to determine the location of non-conforming or missing ADA ramps. Craven <br />Thompson developed a set of construction plans for installation of the ramps per FDOT standards. <br /> <br />E | Page 17