<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Luis Pimentel, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Civil Engineer
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />14
<br />b. WITH CURRENT FIRM
<br />6
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science - Civil Engineering
<br />Florida International University (2008)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer - Florida No. 86616 (2018)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 29th Place (North) Roadway Improvements
<br />Aventura, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project included surveying, design, permitting, and construction services for the milling and resurfacing of
<br />existing roadway, installation of curb and gutter, pavement marking, signage, and traffic signal loops drainage
<br />installation, cleaning and videoing of drainage system, sidewalk construction, tree removal and installation, and
<br />light pole modifications on NE 29th Place (North) from Aventura Boulevard to NE 203rd Street.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 191st Street Drainage Improvements
<br />Aventura, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer - The stormwater improvements included the removal of 425 LF of C.M.P. replaced with 24”
<br />R.C.P. and exfiltration trench, along with 140 LF of new trench. The local site constraints and soil conditions did
<br />not allow for the construction of the standard Miami Dade County exfiltration trench section so the typical trench
<br />section proposed is 5’ wide x 4.5’ tall, with the bottom of the trench depth varying from 6.5’ to 8.5’ below grade.
<br />This section allowed the contractor to utilize a standard trench box as opposed to sheet piles which would be
<br />required for deeper installations. The improvements also included four drainage wells with baffle structures.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 185th Street Turn Lane Extension
<br />Aventura, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014 - 2015
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Pimentel prepared paving, grading, and drainage drawings for the extended westbound left turn lane on NE
<br />185th Street; prepared Pavement Marking and Signage drawings; prepared, submitted, and processed permit
<br />applications through Miami-Dade County Public Works.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Gardens Livable Neighborhoods Vista Verde Phases 1C,
<br />1D, 2, & 3, Miami Gardens, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2019 - 2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Assisted in the design and permitting of stormwater improvements for multiple areas within the Vista Verde
<br />neighborhood in the City of Miami Gardens. Improvements included: 7,280 linear feet of storm sewer, 5,640
<br />linear feet of exfiltration trench, 140 drainage structures, 30,050 SY of roadway milling & resurfacing, and
<br />29,900 SY of roadway reconstruction.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 207tth Street Milling & Resurfacing Project
<br />Aventura, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project included the milling and resurfacing of NE 207th Street from Biscayne Boulevard up to the One Island
<br />Place gatehouse, which is approximately 2,100 feet East of NE 34th Avenue. The Work also included curb &
<br />gutter repair, pavement marking & signage, and manhole/valve box adjustments.
<br />
<br />E | Page 19
|