Laserfiche WebLink
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Luis Pimentel, P.E. <br />13. ROLE IN THIS CONTRACT <br />Civil Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />14 <br />b. WITH CURRENT FIRM <br />6 <br />15. FIRM NAME AND LOCATION (City and State) <br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science - Civil Engineering <br />Florida International University (2008) <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer - Florida No. 86616 (2018) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />NE 29th Place (North) Roadway Improvements <br />Aventura, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The project included surveying, design, permitting, and construction services for the milling and resurfacing of <br />existing roadway, installation of curb and gutter, pavement marking, signage, and traffic signal loops drainage <br />installation, cleaning and videoing of drainage system, sidewalk construction, tree removal and installation, and <br />light pole modifications on NE 29th Place (North) from Aventura Boulevard to NE 203rd Street. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />NE 191st Street Drainage Improvements <br />Aventura, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer - The stormwater improvements included the removal of 425 LF of C.M.P. replaced with 24” <br />R.C.P. and exfiltration trench, along with 140 LF of new trench. The local site constraints and soil conditions did <br />not allow for the construction of the standard Miami Dade County exfiltration trench section so the typical trench <br />section proposed is 5’ wide x 4.5’ tall, with the bottom of the trench depth varying from 6.5’ to 8.5’ below grade. <br />This section allowed the contractor to utilize a standard trench box as opposed to sheet piles which would be <br />required for deeper installations. The improvements also included four drainage wells with baffle structures. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />NE 185th Street Turn Lane Extension <br />Aventura, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 - 2015 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Pimentel prepared paving, grading, and drainage drawings for the extended westbound left turn lane on NE <br />185th Street; prepared Pavement Marking and Signage drawings; prepared, submitted, and processed permit <br />applications through Miami-Dade County Public Works. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Gardens Livable Neighborhoods Vista Verde Phases 1C, <br />1D, 2, & 3, Miami Gardens, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2019 - 2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Assisted in the design and permitting of stormwater improvements for multiple areas within the Vista Verde <br />neighborhood in the City of Miami Gardens. Improvements included: 7,280 linear feet of storm sewer, 5,640 <br />linear feet of exfiltration trench, 140 drainage structures, 30,050 SY of roadway milling & resurfacing, and <br />29,900 SY of roadway reconstruction. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />NE 207tth Street Milling & Resurfacing Project <br />Aventura, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The project included the milling and resurfacing of NE 207th Street from Biscayne Boulevard up to the One Island <br />Place gatehouse, which is approximately 2,100 feet East of NE 34th Avenue. The Work also included curb & <br />gutter repair, pavement marking & signage, and manhole/valve box adjustments. <br /> <br />E | Page 19