My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />1 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />NE 14th Avenue Streetscape Improvements <br />Hallandale Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 2018 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> <br />a. PROJECT OWNER <br />b. POINT OF CONTACT NAME <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Hallandale Beach Mr. Manga Ebbe <br />Project Manager <br />Phone: (954) 457-3043 <br />Email: mebbe@hallandalebeachf.gov <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The project area is along NE 14th Avenue between Hallandale Beach Boulevard and Atlantic Shores Boulevard. <br />The project corridor is approximately 3,400 linear feet. The project included: Mill and overlay entire roadway <br />(including pavement markings); on east side of NE 14th Avenue, mill and overlay off-street parking (including <br />pavement markings) and provide new Type āDā curbed landscape bulb-outs to delineate parallel parking and <br />include canopy trees, shrubs, groundcover and spray and drip irrigation; bike lanes on both sides of roadway; <br />curbing or other treatments at existing driveway entrances; canopy trees with ground cover intermingled and drip <br />irrigation on the west side of NE 14th Avenue; landscape screening along north, south, and west sides of the two <br />(2) storm water pump stations. Construction Cost: $1,157,205.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & Associates, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime - Surveying, Streetscape, Landscape <br />Architecture, Streetscape, Roadway Design & <br />Permitting Services <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />e. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br /> <br />E | Page 20
The URL can be used to link to this page
Your browser does not support the video tag.