My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />5 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />Sidewalk, Swale, Drainage & Roadway Improvements <br />Hallandale Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 2016 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> <br />a. PROJECT OWNER <br />b. POINT OF CONTACT NAME <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Hallandale Beach Mr. Peter Kunen, P.E. <br />City Engineer <br />Phone: (954) 457-3042 <br />Email: pkunen@cohb.org <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The project included ADA connections, sidewalks and drainage improvements for the project. The sidewalk was <br />installed to complete the existing neighborhood sidewalk network. Swales were constructed adjacent to the new <br />sidewalks and exfiltration trench was installed to eliminate nuisance flooding. Craven Thompson provided <br />roadway design, drainage design, topographic survey, upgraded ADA pedestrian ramps and driveways, <br />sidewalks, re-graded swales and coordination with drainage agencies. <br />Construction Cost: $108,080.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & Associates, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime – Surveying, stormwater modeling, <br />drainage design, permitting, and CEI Services <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />c. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />d. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />e. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />E | Page 24
The URL can be used to link to this page
Your browser does not support the video tag.