My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craven Thompson & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:19:08 AM
Creation date
8/21/2020 10:17:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY <br /> NUMBER <br />6 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />NE 38th Street Complete Streets Project <br />Oakland Park, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 2013 - 2015 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Oakland Park <br />Ms. Jennifer Frastai, ICMA-CM <br />Director of Engineering & Community <br />Development <br />Phone: (954) 630-4477 <br />Email: Jenniferf@oaklandparkfl.gov <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />This Complete Streets Project involved <br />providing surveying, civil engineering <br />landscape architectural services for the design <br />and permitting of approximately 0.90 miles of <br />roadway improvements. The engineering <br />services included a complete storm drainage <br />system, a roundabout to replace an existing <br />traffic signal, traffic calming devices, <br />landscape and streetscape enhancement, <br />utility coordination and relocation, and full <br />roadway reconstruction. The main Project <br />objective was to discourage truck traffic and <br />redirect cut-through traffic from NE 38th Street <br />to alternate routes between Andrews Avenue <br />and NE 11th Avenue. This project required <br />permit approvals from Broward County <br />Environmental Protection Department (EPD), <br />and the City of Oakland Park Public Works and Engineering and Community Development Departments. <br />Construction Cost: $3,247,136.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & Associates, <br />Inc. <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime - Streetscape, Landscape Architecture, <br />Urban Design and Surveying Services <br />b. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />c. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />d. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br />e. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br /> <br /> <br /> <br /> <br /> <br />E | Page 25
The URL can be used to link to this page
Your browser does not support the video tag.