My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Saltz Michelson Architects
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Saltz Michelson Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:21:41 AM
Creation date
8/21/2020 10:20:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT APPROACH AND UNDERSTANDINGD. <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) <br />City of Sunny Isles Beach RFQ 20-07-01| PAGE 14 <br />5. Building Information Remodeling <br />To provide increased value to our clients, our team <br />uses Building Information Modeling (BIM) technol- <br />ogy to establish a collaborative platform for the entire <br />project team to communicate through Revit. This tool <br />allows us to create a single, easily shared 3D product <br />model of building components that includes all of a <br />project’s design information. Changes made to one <br />element of the model are reflected in all views. <br />Through the use of BIM, our team will deliver the <br />highest quality project during all phases of the <br />project life-cycle. <br /> <br />The majority of the BIM industry now includes Virtual <br />Design & Construction applications that provide a 4D <br />perspective and a better collective understanding of <br />design intent and construction execution. Complex <br />design can become a reality when compared to con- <br />nection construction processes of the past. <br />Broward County Addiction Recovery Center (BARC) <br />This 51,419 square foot, two-story addiction treatment facility adhered to all of the requirements of its contract with Broward <br />County including visualization, scheduling, clash detection, interference management, and COBie software. This was <br />the first project for Broward County completed using BIM. <br />3D Model | Virtual <br />Reality Drawings <br />Actual <br />Photos <br />Broward County Transit Center <br />This new transit center will serve over 8,000 <br />transit passengers daily. To the right are current <br />examples of 3D Modeling and Virtual Design <br />Reality. This project will be the first totally <br />NET-ZERO facility in Broward County.
The URL can be used to link to this page
Your browser does not support the video tag.