|
QUALIFICATION INFO & ASSIGNED PERSONNELE.
<br />CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE)
<br />City of Sunny Isles Beach RFQ 20-07-01| PAGE 19
<br />12. NAME 13. ROLE IN THIS CONTRACT
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRMa. TOTAL
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />a.
<br />b.
<br />c.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />e.
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Charles A. Michelson AIA, ACHA, LEED AP Principal-In-Charge 40 40
<br />Saltz Michelson Architects, Inc. Fort Lauderdale, Florida
<br />Bachelor of Architecture, 1979, University of Miami
<br />Master of Urban and Regional Planning, 1981,
<br />University of Miami
<br />1993-1997/ 2001-2004/ 2006-
<br />2009/ 2011-2016/ 2016-2020
<br />1993-1997/ 2001-2004/ 2006-
<br />2009/ 2011-2016/ 2016-2020
<br />Broward County (Continuing Contract)
<br />Various Locations, Florida
<br />Under the firm’s continuing contract with the County (recently renewed for the fifth time), SMA has been involved with multiple projects
<br />with varying scopes, sizes and costs. Projects within the past five years include design criteria for the convention center, fourth floor reno-
<br />vation at Government Center West, first floor renovation at Government Center East, bus charging infrastructure, Judicial complex, and
<br />Judges bench. Cost: Various under $2,000,000. Role: Principal-in-Charge.
<br />Florida Department of Management Services (Continuing Contract)
<br />Boynton Beach & Lantana, Florida
<br />WXEL-TV/PBS Reglazing & Roof Replacement, Boynton Beach, FL: Complete roof replacement, curtain wall (building envelope) replacement and emergency back-
<br />up A/C system for control rooms support. New glazing storefront and window systems along select areas of the east, north and west sides of the building were removed
<br />and reinstalled. Cost: $1,500,000. Role: Principal-in-Charge. Lantana Motorist Services Facility, Lantana, FL: Renovation of a 6,700 SF office building for the Florida
<br />Highway Safety and Motor Vehicles Department. Project includes new office and training room layout, ADA compliant bathrooms and transaction counter, new finishes
<br />throughout, new A/C unit and duct work throughout, new roof system and new exterior windows and doors. Cost: $650,000. Role: Principal-In-Charge.
<br />Broward College (Continuing Contract)
<br />Broward County, Florida
<br />Successful completion of multiple college remodeling projects under the firm’s continuing contract with Broward College (recently re-awarded) on all
<br />four of their campuses. Projects have included the Will & Jo Holcombe Institute for Higher Learning, Building 8 Dental Lab, Nursing Lab, and Clinical
<br />Practice, and the Maroone Automotive Training Facility. Scopes of work have included remodeling, renovations, architectural survey work, budget
<br />preparation, and reroofing projects. Cost: Various. Role: Principal-in-Charge.
<br />1995-PresentMemorial Healthcare System (Continuing Contract)
<br />Broward County, Florida
<br />Our open ended contract with Memorial Healthcare System (25 consecutive years) has included projects within Memorial Regional
<br />Hospital, Memorial Regional Hospital South, Memorial Hospital Pembroke, Memorial Hospital Miramar, Memorial Hospital Office
<br />Centre, Memorial Hospital West Office Building and other medical facilities in buildings throughout South Broward County. Cost:
<br />Various ($50,000 - $28,000,000). Role: Principal-in-Charge.
<br />Registered Architect Florida, #9976
<br />Registered Architect Georgia, #00874
<br />Professional Accreditation: Leadership in Energy and Environmental Design (LEED AP); American College of Healthcare Architects (ACHA). Professional Affiliations: American Institute of Architects (AIA),
<br />U.S. Green Building Council (USGBC), South Florida Hospital & Healthcare Association (SFHHA); Certificate of Completion: ASHE Healthcare Construction Certificate, 2004; Public Service: Facilities
<br />Task Force for the Broward County School Board, 1992-1999, Chairman 1994 -1995, 1998, Smart Schools Task Force, Department of Management Services 1999-present, Construction & Design
<br />Subcommittee of the Broward Educational Planning Initiative, 1996.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />X
<br />X
<br />X
<br />X
<br />10. RELEVANT PROJECTS
<br />City of Weston (Continuing Contract)Weston, Florida
<br />Under our continuing contract with the City, renovation of 15 park restroom buildings located at various parks throughout the city. The
<br />scope of the work includes complete internal demo and reinstallation of new fixtures, partitions, floor and wall tile surfaces, and restroom
<br />accessories. Cost: $1,700,000. Role: Principal-In-Charge.
<br />X
<br />20162016
<br />2015/2018
<br />1995-2010/2012-Present
<br />2015/2018
<br />1995-2010/2012-Present
<br />1995-Present
|