QUALIFICATION INFO & ASSIGNED PERSONNELE.
<br />CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE)
<br />City of Sunny Isles Beach RFQ 20-07-01| PAGE 20
<br />12. NAME 13. ROLE IN THIS CONTRACT
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRMa. TOTAL
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />a.
<br />b.
<br />c.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />e.
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Sheff L. Devier AIA Senior Project Manager & QA/QC 45 19
<br />Saltz Michelson Architects, Inc. Fort Lauderdale, Florida
<br />Virginia Polytechnic Institute & State University,
<br />Bachelor of Architecture, 1975
<br />20152015Broward County Main Library Wind Mitigation & Hurricane Hardening
<br />Fort Lauderdale, Florida
<br />Wind mitigation and renovation of The Broward County Main Library Building and covered pedestrian bridge to current
<br />Florida Building Code and FM Global Standards. The work was staged for uninterrupted and continued use of the facility
<br />and egress. Cost: $11,000,000. Role: Project Manager
<br />X
<br />20082008Boulevard Heights Community Center & Hollywood West Sports Park
<br />Hollywood, Florida
<br />After a public referendum to issue a General Obligation Bond was passed by the City of Hollywood, Florida voters in
<br />2004, along with a $100,000 grant from Broward County, the City engaged Saltz Michelson Architects to master plan the
<br />12.24 acre site, create a new Community Center, and redevelop the Sports Park. Cost: $6,300,000. Role: Project Manager.
<br />X
<br />OngoingOngoingMiami Dade College, North Campus Bldg. 1000 Deferred Maintenance Project(Continuing Contract) Miami, Florida
<br />Upgrades to Building 1000 to address existing deficiencies such as building envelope refurbishment, exterior paint, and
<br />miscellaneous mechanical and electrical upgrades. Cost: $1,822,500. Role: Project Manager.
<br />X
<br />X
<br />Registered Architect Florida, #007699
<br />Professional Affiliations: American Institute of Architects (AIA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />10. RELEVANT PROJECTS
<br />1993-1997/ 2001-2004/ 2006-
<br />2009/ 2011-2016/ 2016-2020
<br />1993-1997/ 2001-2004/ 2006-
<br />2009/ 2011-2016/ 2016-2020
<br />Broward County (Continuing Contract)
<br />Broward County, Florida
<br />Under the firm’s continuing contract with the County (27 years), SMA has been involved with multiple projects with varying scopes,
<br />sizes and costs. Projects within the past five years include design criteria for the convention center, Booher building expansion
<br />and renovation, Government Center West fourth floor renovation, Government Center East first floor renovation, bus charging
<br />infrastructure, Judicial complex, and Judges bench. Cost: Various under $2,000,000. Role: Project Manager.
<br />X
<br />20152015City of Weston Emergency Operations Center
<br />Weston, Florida
<br />An approximately 25,000 SF, three-story Emergency Operations / Code Services / Information Technologies Services Building. The
<br />offices for Building Code, Zoning Code, Fire Code, Code Enforcement and Records Storage are on the first floor. Located on the
<br />second floor are the City’s Emergency Operations Center, kitchen facilities, IT Offices, and multi-purpose space. The third floor is for staff
<br />sleeping quarters and support spaces. Cost: $7,400,000. Role: Project Manager.
|