Laserfiche WebLink
QUALIFICATION INFO & ASSIGNED PERSONNELE. <br />CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) <br />City of Sunny Isles Beach RFQ 20-07-01| PAGE 20 <br />12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Sheff L. Devier AIA Senior Project Manager & QA/QC 45 19 <br />Saltz Michelson Architects, Inc. Fort Lauderdale, Florida <br />Virginia Polytechnic Institute & State University, <br />Bachelor of Architecture, 1975 <br />20152015Broward County Main Library Wind Mitigation & Hurricane Hardening <br />Fort Lauderdale, Florida <br />Wind mitigation and renovation of The Broward County Main Library Building and covered pedestrian bridge to current <br />Florida Building Code and FM Global Standards. The work was staged for uninterrupted and continued use of the facility <br />and egress. Cost: $11,000,000. Role: Project Manager <br />X <br />20082008Boulevard Heights Community Center & Hollywood West Sports Park <br />Hollywood, Florida <br />After a public referendum to issue a General Obligation Bond was passed by the City of Hollywood, Florida voters in <br />2004, along with a $100,000 grant from Broward County, the City engaged Saltz Michelson Architects to master plan the <br />12.24 acre site, create a new Community Center, and redevelop the Sports Park. Cost: $6,300,000. Role: Project Manager. <br />X <br />OngoingOngoingMiami Dade College, North Campus Bldg. 1000 Deferred Maintenance Project(Continuing Contract) Miami, Florida <br />Upgrades to Building 1000 to address existing deficiencies such as building envelope refurbishment, exterior paint, and <br />miscellaneous mechanical and electrical upgrades. Cost: $1,822,500. Role: Project Manager. <br />X <br />X <br />Registered Architect Florida, #007699 <br />Professional Affiliations: American Institute of Architects (AIA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />10. RELEVANT PROJECTS <br />1993-1997/ 2001-2004/ 2006- <br />2009/ 2011-2016/ 2016-2020 <br />1993-1997/ 2001-2004/ 2006- <br />2009/ 2011-2016/ 2016-2020 <br />Broward County (Continuing Contract) <br />Broward County, Florida <br />Under the firm’s continuing contract with the County (27 years), SMA has been involved with multiple projects with varying scopes, <br />sizes and costs. Projects within the past five years include design criteria for the convention center, Booher building expansion <br />and renovation, Government Center West fourth floor renovation, Government Center East first floor renovation, bus charging <br />infrastructure, Judicial complex, and Judges bench. Cost: Various under $2,000,000. Role: Project Manager. <br />X <br />20152015City of Weston Emergency Operations Center <br />Weston, Florida <br />An approximately 25,000 SF, three-story Emergency Operations / Code Services / Information Technologies Services Building. The <br />offices for Building Code, Zoning Code, Fire Code, Code Enforcement and Records Storage are on the first floor. Located on the <br />second floor are the City’s Emergency Operations Center, kitchen facilities, IT Offices, and multi-purpose space. The third floor is for staff <br />sleeping quarters and support spaces. Cost: $7,400,000. Role: Project Manager.