|
QUALIFICATION INFO & ASSIGNED PERSONNELE.
<br />CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE)
<br />City of Sunny Isles Beach RFQ 20-07-01| PAGE 27
<br />12. NAME 13. ROLE IN THIS CONTRACT
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRMa. TOTAL
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />a.
<br />b.
<br />c.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />e.
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Michael Kroll RLA, FASLA Principal-In-Charge/Landscape Architect 34 32
<br />Miller Legg & Associates, Inc. Fort Lauderdale, Florida
<br />Bachelor of Landscape Architecture /
<br />Graduate Studies / Urban and Regional Planning
<br />20202020City of Miami Beach 20th Street & Sunset Drive Pocket Park
<br />Miami Beach, Florida
<br />Principal-In-Charge: Under our Continuing Contract with the City, Miller Legg was awarded an assignment to provide survey, civil, geotechnical, electrical,
<br />structural engineering and landscape architecture services for the design, permitting and construction of a new ADA-accessible .33-acre pocket park at 20th
<br />Street and Sunset Drive. The firm prepared a boundary and topographic survey, assisted with the planning of key program elements and performed schematic
<br />design, design development, construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design
<br />(CPTED) principles. Arborist and irrigation design services were also furnished for this project.
<br />N/A2018
<br />City of Miami Beach Flamingo & Collins Historical Surveying
<br />Miami Beach, Florida
<br />Principal-In-Charge: Miller Legg was retained by the City of Miami Beach to conduct surveys in order to prepare FEMA elevation certificates for the Historic
<br />Buildings classification and Lifting Feasibility Guidelines Study of 444 structures in the Flamingo Park Historical District and 86 structures in the Collins Waterfront
<br />Historical District. This work was part of a project to evaluate the City's options for these structures (including elevation, remain in place, demolish, relocate,
<br />arden) in preparation for any future sea-level rise. GIS was used to efficiently collect and assemble project photos and data in the field. Miller Legg worked in
<br />tandem with our structural engineering subconsultant in its structural lifting analysis assignment for this project.
<br />TBD2020City of Miami Beach 19th Street Stormwater Pump Station Miami Beach, Florida
<br />Principal-In-Charge: Construction of this pump station was part of the overall plan for the City-wide stormwater improvement system to reduce flooding
<br />for residents of the Washington Avenue and Convention Center Drive neighborhood. Miller Legg provided topographic surveying services, a survey of
<br />utility designation markings, and an as-built survey of constructed improvements on the 19th Street pump station, the associated parking area and the
<br />re-capping areas of the seawall. Also, Miller Legg provided tree inventory and analysis, hardscape, landscape and irrigation design.
<br />FL / Registered Landscape Architect
<br />TX / Registered Landscape Architect
<br />Fellow American Society of Landscape Architects
<br />During his extensive career, Mr. Kroll, President of Miller Legg, has been actively involved in projects ranging from campus-wide educational facilities to international urban
<br />redevelopment projects. Mr. Kroll's diverse professional experience has led to projects that successfully integrate engineering, environmental, planning and landscape architectural
<br />services. Under his leadership, Miller Legg develops project solutions that respond to the natural environment, respect the social fabric and create sustainable aesthetic spaces.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />20132013Sunny Isles Beach Gwen Margolis Park & Pelican Community Park Artificial Turf
<br />Sunny Isles Beach, Florida
<br />Principal-In-Charge: The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator
<br />Gwen Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage
<br />plans to collect under the new drain systems installed as part of the project, as well as surveying services. In addition, construction
<br />observation was provided to verify compliance with the plans and for the certification of the project through regulatory agencies.
<br />X
<br />X
<br />X
<br />X
<br />X
<br />10. RELEVANT PROJECTS
<br />TBD2019City of Miami Museum Park Baywalk Phase 3 Miami, Florida
<br />Principal-In-Charge: Miller Legg is providing landscape architecture, civil engineering, lighting/electrical engineering, surveying, SUE, permitting and
<br />limited construction administration services for the Miami Baywalk Phase 3 Project. Permitting of the project improvements was provided through the
<br />City of Miami, Miami-Dade County and South Florida Water Management District. Funding for this project was acquired through the Florida Inland
<br />Navigational District (FIND) Grants Program. This project was performed under our Miscellaneous Landscape Architectural Services contract.
|