My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Survey Document Review <br />Engenuity Group will review all plats, boundaries, <br />and sketch and descriptions in a timely manner, <br />following the standards in the industry. Each <br />review will generate a comments letter. <br />PERFORMANCE BENCHMARKS AND PLANS <br />Engenuity has a clear and concise protocol for <br />completing a project, from the beginning to the <br />end, where final signed and sealed survey plans <br />are submitted to the City for review and for the <br />use of the project Architect or Engineer. These <br />different phases of the project, or benchmarks, <br />allow for a time-tested and proven product to <br />be delivered to the City with utmost accuracy. <br />Every step is quality controlled and ultimately <br />sent to our Quality Control Manager who gives a <br />final review before turning it over to City Staff. <br />These Benchmarks include: <br /> Horizontal & Vertical Control set-up by Field <br />Crew Manager to ensure accuracy in the <br />field, <br /> Collection of all data in the field by crews <br />under management of experienced Crew <br />Chief, <br /> Download of collected data to server for use <br />in creating maps, <br /> Completion of first draft by AutoCAD drafters <br />for review and redline by Project Manager, <br /> Revisions and fine tuning of maps, <br /> Penultimate check by project manager to <br />ensure accuracy, <br /> Final review by Quality Control <br />QUALITY CONTROL <br />After completion of survey drawings, or any other <br />deliverable, Engenuity Group, Inc. has a formal <br />review period. The project will be reviewed by C. <br />Andre Rayman, P.S.M., Engenuity Group’s Quality <br />Control/Quality Assurance Manager who has had <br />no participation in the project. The review <br />elevates the quality of the final product. <br />Engenuity Group has developed procedures <br />which can catch possible field errors during <br />construction, by an in-house review of the work <br />performed. It takes approximately one day to <br />perform an in-office check of the file. <br />Construction does not begin until review is <br />finalized. <br />Engenuity Group internally schedules weekly <br />staff meetings as well as quarterly project <br />reviews for clients, manpower and scheduling <br />needs. Engenuity Group uses Deltek Financial <br />Management software which is a project <br />management/accounting program specific to <br />engineers/architects for project cost control and <br />accounting. To meet budget requirements, <br />during the proposal stage, we establish the hours <br />assigned for each unique task. <br />Once a task is approved all information <br />regarding due dates and budgets are entered <br />into work orders in Deltek including all of those <br />Sunny Isles Beach <br />12
The URL can be used to link to this page
Your browser does not support the video tag.