Laserfiche WebLink
involving sub-consultants. This allows us to <br />supervise all sub-consultants to ensure they <br />adhere to timeframe and monetary <br />requirements. In addition, we can input detailed <br />information regarding the contracts that are <br />current, making it easy to keep in compliance <br />with all regulations and contract parameters. <br />After completion of construction plans, rather <br />than immediately submitting to the government <br />agencies for approval, Engenuity Group, Inc. <br />has a formal review period. The project will be <br />reviewed by one of Engenuity Group’s senior <br />project managers who has had no participation <br />in the project. The review period takes about <br />one week but can be sped up based on County <br />priorities. <br />Engenuity Group has developed a “Quality <br />Control Checklist” which specifically lists items to <br />guide the Review Committee’s process of <br />approving the plans for construction. Each <br />specific item must be addressed as to whether it <br />is sufficient, insufficient or not applicable. <br /> Signatures are ultimately required by all Review <br />Committee members to stress the importance <br />and responsibility and seriousness of our QA/QC <br />Process. <br /> At Engenuity Group, Inc. we pride ourselves in <br />keeping an open line of communication at all <br />times. We openly share our mobile numbers and <br />emails, in addition to the main office phone, <br />where we can be reached at all times. We know <br />that the City of Sunny Isles Beach serves the <br />citizens, and by extension so would we. We <br />would welcome all staff and Project Managers <br />to contact us at any time should the need arise. <br />The role of Engenuity Group’s Technical Review <br />Committee is to be an unbiased group of <br />surveyors whose responsibility is to review plans <br />and other survey documents. We have <br />developed a Quality Control Checklist which is <br />based on the Minimum Technical standards <br />checklist. Each specific item must be addressed <br />and deemed sufficient, insufficient or not <br />applicable. Signatures are ultimately required <br />by all Review Committee members to stress the <br />importance and responsibility and depth of our <br />QA/QC Process. A copy of our Quality Control <br />Manual, Checklist and Technical Review <br />Committee process is available upon request. <br />EQUIPMENT <br />Our offices are outfitted with state of the art <br />equipment and the latest software for office <br />management accounting, and design in order <br />to produce the best quality, most accurate <br />product efficiently. <br />We utilize two aerial drones operated by one of <br />our two FAA licensed technicians: Phantom 4 Pro <br />and the DJI Inspire 2. The DJI Inspire 2 has the <br />capacity of flying for almost 30 minutes while <br />taking 360° view range photo/video with up to <br />6K and can fly 50MPH, with app control. <br />In addition, our technicians operate a Seafloor <br />Sunny Isles Beach <br />13