Laserfiche WebLink
<br /> STANDARD FORM 330 (1/2004) PAGE 2 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Adam C. Swaney, P.E., LEED <br />AP <br />13. ROLE IN THIS CONTRACT <br />Prime Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 15 <br />b. WITH CURRENT FIRM <br /> 8 <br />15. FIRM NAME AND LOCATION (City and State) <br />Engenuity Group, Inc. (Deerfield Beach, Florida) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science / Civil Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida / Civil Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />LEED Accredited Professional, FL, 2009. <br />Young Engineer of the Year, American Society of Civil Engineers, Palm Beach Branch, 2008. <br />ASCE Younger Member Coordinator, Palm Beach Branch, 2006-2008. <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Earman River Intake Pump <br />(North Palm Beach, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The Village of North Palm Beach and Engenuity Group, Inc. worked together to demolish the existing lift <br />station and the design of a new dual- pump station that included a new structured cover and faster <br />pumps. Adam prepared civil drawings indicating drainage, grading, and pump station work, pollution <br />prevention plan, and applications affiliated with Village of North Palm Beach Drainage and South <br />Florida Water Management District. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Southshore Boulevard <br />(Wellington, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost , etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />This roadway serves as the gateway entrance to the Equestrian Communities in southern Wellington. <br />This Project design involved the widening and re-grading of approximately 1 mile of Southshore <br />Boulevard from 50th Street to Lake Worth Road. Engenuity Group, Inc. performed the survey as well as <br />the civil engineering design of the project. The design plans included paving, drainage, grading, plan, <br />profile, typical sections, cross sections, signing, marking, and intersection improvements at the Lake <br />Worth Road and Southshore Blvd. intersection. This section of Southshore Blvd. was in need of <br />rehabilitation due to the settlement and cracking of the asphalt, which was likely caused by the <br />proximity of an existing ditch running along the roadway. <br />c. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Driver’s License Office <br />(Palm Beach Gardens , FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />For this property In Palm Beach Gardens EGI provided preliminary engineering services for wastewater <br />and water work. Mr. Swaney served as project manager, through the preparation of conceptual <br />drawings for drainage, paving, wastewater, and water work, drainage statement and drainage <br />calculations while coordinating with Seacoast Utilities. Next he managed the design and perm itting <br />phase from drawing preparations to permit submittals. Finally, he oversaw the construction phase from <br />site visitations to the preparation of certifications. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Atlantic Dunes Park <br />(Delray Beach, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Swaney provided Project Engineer services for the design and construction of seawall <br />replacements and parking lot and park improvements that include bathroom <br />rehabilitations and boardwalk/nature trail construction. <br />e . (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />18