My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 (1/2004) PAGE 2 <br />Lakewood Road Sidewalk Improvements <br />(Palm Springs, FL) <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The sidewalk improvements were designed with special considerations to ADA and Village <br />standards and regulations. Mr. Swaney prepared preliminary and final design plans and <br />documents, obtained necessary permits, provided bidding assistance, and assisted <br />construction administration efforts. <br />f . <br />(1) TITLE AND LOCATION (City and State) <br />Village of Palm Springs – Cypress Lane Stormwater <br />Improvements <br />(Palm Springs, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />In order to improve drainage around the Town Hall and Police Department Building <br />improvements were planned by the Village and designed by Engenuity Group, with Mr. <br />Swaney as Project Engineer. In 2018 Mr. Swaney provided design, permitting and <br />construction phase services to replace the watermain. He then designed the installation of <br />stormwater catch basins and piping along the east and west sides of Cypress Lane, to <br />connect to the existing stormwater infrastructure on the east side of Davis Road. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />Fire Station #2 <br />(Riviera Beach, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The old Fire Station No. 88 site is being repurposed into a new facility to be known as Fire <br />Station No. 2. This site will consider shared access and parking with the City’s Barracuda <br />Bay Water Park. As Project Engineer, Mr. Swaney is responsible for much of this project’s <br />development through the schematic design, design development, construction <br />documents preparation, permitting and bidding phase, and construction administration & <br />certification phases. <br />h. <br />(1) TITLE AND LOCATION (City and State) <br />Village of Palm Springs <br />(Palm Springs, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> Ongoing <br />CONSTRUCTION (If applicable) <br /> N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> 2017&2018 Lift stations - prepared construction documents, submitted permit <br />applications, provided bidding assistance, construction observation, and construction <br />contract administration <br /> Cypress Lane Stormwater Improvements And Watermain Replacement <br /> <br />19
The URL can be used to link to this page
Your browser does not support the video tag.