|
<br />
<br /> STANDARD FORM 330 PAGE 2
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Tara Bamber, P.E.
<br />13. ROLE IN THIS CONTRACT
<br /> Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 14
<br />b. WITH CURRENT FIRM
<br /> 3
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Engenuity Group, Inc. (Deerfield Beach, Florida)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S., Civil Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida/ Civil Engineering
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
<br />Florida Stormwater Association Member
<br />Member, Florida Engineering Society
<br />Member, National Society of Professional Engineers
<br />Member, American Society of Civil Engineers
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Riviera Beach Fire Station #2
<br />(Riviera Beach, Florida)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br /> Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIF IC ROLE Check if project performed with current firm
<br />Project Manager through the schematic design, design development, construction document
<br />preparation, permitting, bid coordination and construction administration & certification
<br />phases. The old site will have a new facility (Fire Station #2) and will share parking and access
<br />with Barracuda Bay Waterpark, and will include a temporary facility on site.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Point Manalapan Drainage
<br />(Manalapan, Florida)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2017
<br />CONSTRUCTION (If applicable)
<br /> 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mrs. Bamber was responsible for accounting drainage structures and outfalls, researching the
<br />dedication of improvements to determine responsible maintenance entities, listing the
<br />corrective measures to address flooding issues, evaluate future maintenance or repair needs,
<br />and provide an opinion of costs.
<br />c .
<br />(1) TITLE AND LOCATION (City and State)
<br />Village of Palm Springs
<br />(Palm Springs, Florida)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> Ongoing
<br />CONS TRUCTION (If applicable)
<br /> Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, et c.) AND SPECIFIC ROLE Check if project performed with current firm
<br /> 2017&2018 Lift stations - prepared construction documents, submitted permit
<br />applications, provided bidding assistance, construction observation, and construction
<br />contract administration
<br /> Cypress Lane Stormwater Improvements And Watermain Replacement
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Stormwater Master Plan
<br />(Riviera Beach, Florida)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONS TRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Prepared a Stormwater Master Plan for the City of Riviera Beach, which included data
<br />collection, extensive modeling of City’s current stormwater facilities, public involvement and
<br />education, a financial plan, and preparing an overall Stormwater Master Plan Report.
<br />Responsibilities included attending data collection, bimonthly meetings and preparing
<br />meeting minutes, updating the City’s Stormwater Master Plan website, and assisting in
<br />preparing the report.
<br />
<br />21
|