Laserfiche WebLink
<br /> <br /> STANDARD FORM 330 PAGE 2 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Tara Bamber, P.E. <br />13. ROLE IN THIS CONTRACT <br /> Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 14 <br />b. WITH CURRENT FIRM <br /> 3 <br />15. FIRM NAME AND LOCATION (City and State) <br />Engenuity Group, Inc. (Deerfield Beach, Florida) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S., Civil Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida/ Civil Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Florida Stormwater Association Member <br />Member, Florida Engineering Society <br />Member, National Society of Professional Engineers <br />Member, American Society of Civil Engineers <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Riviera Beach Fire Station #2 <br />(Riviera Beach, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIF IC ROLE Check if project performed with current firm <br />Project Manager through the schematic design, design development, construction document <br />preparation, permitting, bid coordination and construction administration & certification <br />phases. The old site will have a new facility (Fire Station #2) and will share parking and access <br />with Barracuda Bay Waterpark, and will include a temporary facility on site. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Point Manalapan Drainage <br />(Manalapan, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> 2017 <br />CONSTRUCTION (If applicable) <br /> 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mrs. Bamber was responsible for accounting drainage structures and outfalls, researching the <br />dedication of improvements to determine responsible maintenance entities, listing the <br />corrective measures to address flooding issues, evaluate future maintenance or repair needs, <br />and provide an opinion of costs. <br />c . <br />(1) TITLE AND LOCATION (City and State) <br />Village of Palm Springs <br />(Palm Springs, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> Ongoing <br />CONS TRUCTION (If applicable) <br /> Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, et c.) AND SPECIFIC ROLE Check if project performed with current firm <br /> 2017&2018 Lift stations - prepared construction documents, submitted permit <br />applications, provided bidding assistance, construction observation, and construction <br />contract administration <br /> Cypress Lane Stormwater Improvements And Watermain Replacement <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Stormwater Master Plan <br />(Riviera Beach, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONS TRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Prepared a Stormwater Master Plan for the City of Riviera Beach, which included data <br />collection, extensive modeling of City’s current stormwater facilities, public involvement and <br />education, a financial plan, and preparing an overall Stormwater Master Plan Report. <br />Responsibilities included attending data collection, bimonthly meetings and preparing <br />meeting minutes, updating the City’s Stormwater Master Plan website, and assisting in <br />preparing the report. <br /> <br />21