My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 (1/2004) PAGE 2 <br />VaE. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Liliana M Vanegas, E.I. <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 12 <br />b. WITH CURRENT FIRM <br />2 <br />15. FIRM NAME AND LOCATION (City and State) <br />Engenuity Group, Inc. (Deerfield Beach, Florida) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S., Civil Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />E.I., Civil Engineering, Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br /> N/A <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Riviera Beach Fire Station #2 Renovations <br />(Riviera Beach, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer through the schematic design, design development, construction document <br />preparation, permitting, bid coordination and construction administration & certification phases. The <br />old site will have a new facility (Fire Station #2) and will share parking and access with Barracuda Bay <br />Waterpark, and will also include a temporary facility on site. Ms. Vanegas attends meetings with <br />Owner, Architect and Fire Rescue Group to further along the design project that fits the scope and <br />criteria. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Foxtail Palm Park <br />(Village of Palm Springs, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer in design, permitting and bidding phases of the development of this new community <br />park. Coordinating with Village Manager and park director, along with the PB County Engineering <br />Department. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Calusa Elementary School Renovations <br />(Boca Raton, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer designing curb ramps, accessible parking, sidewalks, loading zones, and drainage <br />improvements. Project Manager through the design and construction phases, conducting <br />inspections and coordinating with owner, consultants and contractor. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Olympic Heights High School Security <br />Enhancements <br />(Boca Raton, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief s cope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil Design of a new guardhouse and a bus loop connection to the administrative parking, and a <br />roadway connection between parking areas. Prepare construction documents, observe <br />construction and oversee permitting, construction administration and construction certifications. <br />Security enhancement entails creating a single point of entry and adding a two lane roadway from <br />the bus loop to the general parking area and another roadway from the general parking to student <br />parking lot. <br /> <br />22
The URL can be used to link to this page
Your browser does not support the video tag.