My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STANDARD FORM 330 (1/2004) PAGE 2 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Dale Simons <br />13. ROLE IN THIS CONTRACT <br /> AutoCAD Drafter <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 5 <br />b. WITH CURRENT FIRM <br /> <1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Engenuity Group, Inc. (Deerfield Beach, Florida) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />AutoCAD Civil 3D training <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Tequesta Constitution Park <br />(Tequesta, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> Ongoing <br />CONS TRUCTION (If applicable) <br /> Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Simons provided a Civil Engineering Drafting Services for the Tequesta Constitution Park Community <br />Center Project. The Community Center will be a new addition to the existing pavilions, playgrounds, and <br />skate park. The Community Center will be approximately 13,500 GSF. Inside the building will consist of: <br />Lobby, Waiting Area, Fitness Room, Multi-Purpose Space, Activity Room, Game Room, Offices, <br />Break/Copy Room, Restrooms, Storage and Mechanical/Electrical Room. <br />The surveys were conducted on the entire site including pathways, structures, parking lots, and trees. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Delray Training Center <br />(Delray Beach, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONS TRUCTION (If applicable) <br /> Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Simons assisted with the preparation of civil engineering plans and obtained regulatory permits for <br />transforming the property back into a wetland mitigation area, while preserving existing wetland areas <br />with conservation easements. An existing FPL transmission main easement was also utilized to provide <br />wetland mitigation areas. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Century Village - Main Clubhouse Parking Lot <br />(West Palm Beach, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONS TRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Simons provided engineering services to rehabilitate the Clubhouse parking lot, which included <br />handicapped parking and access isles. These updates included a five-foot concrete sidewalk, allowing <br />access along the front of the Clubhouse with curbs and handrails. This replaced the striped pathway <br />leading from the front door area to both the north and south parking areas. These changes brought the <br />parking lot up to ADA standards and compliance. <br />25
The URL can be used to link to this page
Your browser does not support the video tag.