My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STANDARD FORM 330 (1/2004) PAGE 2 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Kender Louisius <br />13. ROLE IN THIS CONTRACT <br /> Project Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 6 <br />b. WITH CURRENT FIRM <br /> 4 <br />15. FIRM NAME AND LOCATION (City and State) <br />Engenuity Group, Inc. (Deerfield Beach, Florida) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S., Civil Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Lakewood Rd Sidewalk <br />(Palm Springs, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONS TRUCTION (If applicable) <br /> 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The Village of Palm Springs is adding new multifamily apartment bui ldings with 96 living units an on- <br />site parking near Lake Worth Road and Milita ry Trail. Mr. Louisius preformed professional due <br />diligence civil engineering services in the development of the 4.93 acre lot. He produced drainage, <br />grading, paving, and wastewater plans as well as submitting associated permits for the project to <br />agencies such as the South Florida Water Management District, the Lake Worth Drainage District, <br />and the Palm Beach County Health Department. The project is currently in permitting phase. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />SR 80 – Lowe’s Road <br />(Royal Palm B each, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />The bridge that r uns over the C-51 Canal also known as “Village Royale Bridge,” is being <br />constructed into a 7 lane bridge due to the expected increase in traffic flow that the new housing <br />development which is also being built will attract. Mr. Louisius served as Project En gineer on the <br />project preparing drainage, grading and paving drawings. The bridge that runs over the C -51 <br />Canal also known as “Village Royale Bridge,” is being constructed into a 7 lane bridge due to the <br />expected increase in traffic flow that the new housi ng development which is also being built will <br />attract. Mr. Louisius served as Project Engineer on the project preparing drainage, grading and <br />paving drawings. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Earman River Intake Pump <br />(North Palm Beach, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONS TRUCTION (If applicable) <br /> 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> The Village of North Palm Beach is renovating and improving this pump station, which requires <br />demolition and new construction. The new construction is for a dual 40HP pump station. The design <br />of site improvements, the construction phase and the preparatio n of construction documents and <br />permit applications is overseen by Project Engineer Mr. Louisius. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Driver’s License Office <br />(Palm Beach Gardens, FL) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONS TRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Louisius served as Project Engineer in the design and construction phase, permitting and <br />construction administration, preparing construction documents, drawings and permits. <br />Specific tasks included establishing the scope and character of the drainage, grading, <br />paving, wastewater and water work to be performed by the contractor; sizing the water <br />service; designing parking areas, sidewalks, wastewater piping and access roads; preparing <br />probable construction cost & pollution prevention plan; providing the requisite technical <br />data for filing applications and permits. <br />24
The URL can be used to link to this page
Your browser does not support the video tag.