My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 (1/2004) PAGE 3 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />5 <br />21. TITLE AND LOCATION (City and State) <br />North Beach Rd Drainage Improvements & <br />Roadway Rehabilitation/Widening <br />(Jupiter Island , Florida ) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Town of Jupiter Island <br />b. POINT OF CONTACT NAME <br />Stuart Trent , P.E. <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(772) 545 -0171 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Engenuity Group was contracted by the Town of Jupiter Island to provide Professional <br />Engineering & Land Surveying services in connection with the North Beach Road project. This <br />project is being completed in three phases; Phase 1 included survey, Phase 2 resolved drainage <br />issues, and Phase 3 consisted of the new roadway design including full depth reclamation. <br /> <br />Our survey services included: <br /> Locating sufficient horizontal control points to register the previously created map to the <br />vertical data <br /> Quality controlling the horizontal features and made updates <br /> Collecting elevations at 50’ stations and high/low points <br /> Providing topography in the wooded conservation areas for future drainage design <br /> Drone <br /> <br />For Phase 2 of this project, Engenuity Group, Inc. provided a Drainage design for the North Beach <br />Road which included water quality/quantity drainage systems in low lying areas to address <br />trapped standing stormwater areas. An opinion of probable cost was included. <br /> <br />The final Phase of this project consisted of the new roadway design. Engenuity Group, Inc. <br />proposed a uniform 18 foot minimum road width and utilized geotechnical reports to determine <br />ultimate pavement design needs. The design is complete and currently out for bid. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Engenuity Group, Inc. <br />(2) FIRM LOCATION (City and State) <br />Deerfield Beach, Florida <br />(3) ROLE <br /> Land Surveying Services & <br />Civil Engineering <br />52
The URL can be used to link to this page
Your browser does not support the video tag.