Laserfiche WebLink
[Type here] <br /> <br />EARMAN RIVER INTAKE PUMP REPLACEMENT <br />NORTH PALM BEACH, FL <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DESCRIPTION <br /> <br />The Earman River Intake Pump got a new look, since the <br />old pump has been demolished a new dual-pump station <br />including in-line shut off valve, dual 40HP pumps, and a <br />covered structure has been added. Engenuity Group <br />provided a Topographic and Location Survey of the pump, <br />surrounding area and intake culvert. <br /> <br />We have also performed the civil engineering design for <br />the new pump station which includes preparing the <br />drainage, grading, and pump station drawings for the new <br />lift station, and all necessary permitting (SFWMD). <br /> <br />CONTACT INFO <br />Chuck Huff <br />Director of Special Projects <br />Village of North Palm Beach <br />501 US Hwy 1 <br />North Palm Beach, FL 33408 <br />(561) 904-2139 (P) <br />(561) 848-3344 (F) <br />chuff@village-npb.org <br /> <br />PROJECT INFO <br />Completed: 12/2018 <br />Duration: 16 months <br />Fees: $1,500 (SURVEY) <br /> $21,700 (ENGINEERING) <br />Change orders: None <br /> <br />Personnel: <br />Jennifer C. Malin P.S.M., <br />Joe Williams, <br />Adam Beck, <br />Keith B. Jackson, P.E., <br />Adam C. Swaney, P.E. <br />Kender Louisius <br /> <br /> <br /> <br />77