My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Type here] <br /> <br />SOUTHGATE BLVD & ROCK ISLAND ROAD <br />TOPOGRAPHIC SURVEY <br />MARGATE, FL <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DESCRIPTION <br /> <br />Engenuity Group, Inc. was contracted by Chen Moore & <br />Associates to complete a topographic survey along Southgate <br />Boulevard and Rock Island Road for the City of Margate. The <br />topographic survey is going to be used to complete design <br />drawings for the construction plans of a new force main. The <br />route of the force main will start at the lift station located at the <br />intersection of S.W. 64th Avenue and Southgate Boulevard and <br />run Westerly along Southgate Boulevard then Northerly along <br />Rock Island Road and through the City of Margate Public Works <br />Department yard to the lift station located on the South side of <br />West Atlantic Boulevard. <br /> <br />Our survey included setting permanent benchmarks along the <br />route, with cross sections within the right-of-way every 100 feet. <br />All storm, sanitary and water structures and the corresponding <br />invert data were located. All trees within the route were <br />located, identified and measured for size. Additionally, cross <br />sections of the Pompano Canal C-14 on both sides of Rock <br />Island Road were completed. <br /> <br />We began the topographic survey in November 2016 and <br />completed and delivered to the client in January 2017. All tasks <br />were completed within budget and ahead of schedule. <br /> <br /> <br /> <br />CONTACT INFO <br />Paula Fonseca, P.E., Project <br />Manager <br />Chen Moore & Associates, Inc. <br />500 Australian Ave S., Suite 850 <br />West Palm Beach, FL 33401 <br />(561) 746-6900 x1160 (P) <br />(561) 746-8333 (F) <br />pfonseca@chenmoore.com <br /> <br />PROJECT INFO <br />Completed: 01/2017 <br />Duration: 2 months <br />Fees: $38,400 <br />Construction Cost: <br />$1,400,000 (EST) <br />$950,000 (ACTUAL) <br />Change orders: None <br />Personnel: <br />Jennifer C. Malin, P.S.M., <br />Joseph Williams, <br />C. Andre Rayman, P.S.M. <br /> <br />79
The URL can be used to link to this page
Your browser does not support the video tag.