Laserfiche WebLink
[Type here] <br /> <br />PBCWUD WATER MAIN IMPROVEMENTS <br />SURVEYING SERVICES <br />WEST PALM BEACH, FL <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DESCRIPTION <br /> <br />Engenuity Group worked under the leadership of CES <br />Consultants, Inc. to perform Professional Surveying Services <br />in connection with improvements to 20 different water <br />main sites around Eastern Palm Beach County. The PBC <br />Water Utilities Department contracted with CES to design <br />plans to rehabilitate and loop targeted problem areas in its <br />system of water <br />Engenuity Group field crews located and recorded all <br />existing water main and surrounding topography as well as <br />elevations of any surrounding water. The size, depth, <br />direction of flow were recorded along with storm drains, <br />culverts, catch basins, and manholes. This data was <br />brought back into the office where Staff ultimately <br />prepared a Topographic and Tree Survey of all locations. <br /> In addition to preparing a Topographic and Tree Survey, <br />Engenuity Group also produced Sketch and Description <br />documents of easements as necessary to perform the <br />improvements of the water main. <br /> <br /> <br />CONTACT INFO <br />Bud Goblisch, P.E. ∙ Vice President <br />CES Consultants, Inc. <br />1555 Palm Beach Lakes Blvd. <br />Suite 920 <br />West Palm Beach FL 33401 <br />P: 561-227-686 <br />F: 561-855-7630 <br />C: 561-214-0000 <br />bgoblisch@cesconsult.com <br /> <br />PROJECT INFO <br />Completed: 01/2018 <br />Duration: 1 Year <br />Fees: $110,350 <br />Construction Cost: N/A <br />Change orders: None <br />Personnel: <br />Jennifer C. Malin, PSM <br />C. Andre Rayman, PSM <br />Adam Beck <br />Joseph Williams <br />Travis Morrell <br />Randy Clyburn <br />Derek Saffold <br /> <br />80