Laserfiche WebLink
[Type here] <br /> <br />STORMWATER DETENTION AREA STUDY <br />SUNNY ISLES BEACH, FL <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DESCRIPTION <br />Engenuity Group provided a Stormwater Detention Area <br />Study for the City of Sunny Isles Beach. Our scope of <br />services provided in the study included: <br /> Meetings with owner to define and clarify owner’s <br />requirements for the project and available data, and <br />review and discuss report conclusions. <br /> Investigated permitting on existing Florida <br />department of transportation (FDOT) detention areas <br />in the general area of AIA (Collins Ave) and SR- 826; <br />and in the general area of AIA and 189th St. <br />Established drainage criteria that was used for <br />drainage areas and storm water calculation <br />methodology. <br /> Prepared a drainage study to address expansion <br />and renovation of these areas as they relate to the <br />correct drainage criteria, aesthetics, and increased <br />storm water storage capacity and discharge, <br />prepare preliminary drainage calculations <br />accordingly. <br />CONTACT INFO <br />Douglas M. Mann, P.E. <br />Project Manager <br />APTIM Corporation <br />2481 NW Boca Raton Blvd. <br />Boca Raton, FL 33431 <br />douglas.mann@aptim.com <br /> <br />PROJECT INFO <br />Completed: Ongoing <br />Duration: Ongoing <br />Fees: $19,500 <br />Construction Cost: <br />N/A <br /> <br />Change orders: None <br />Personnel: <br />Adam C. Swaney, P.E. <br />Liliana Vanegas, E.I. <br />Kimberli Kile, E.I. <br />Keith B. Jackson, P.E. <br />Kender Louisius <br /> <br /> <br />83