Laserfiche WebLink
[Type here] <br /> <br />2017 & 2018 LIFT STATION REHABILITATION <br />PALM SPRINGS, FL <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DESCRIPTION <br /> <br />Engenuity Group, Inc. worked with the Village of Palm <br />Springs Public Services Department to rehabilitate 8 of their <br />65 owned and operated lift stations which were slated to <br />be renovated in the 2017 & 2018 fiscal year. Engenuity <br />Group, Inc. prepared a Topographic Survey of the site, <br />performed preliminary investigation and site plan design, <br />prepared construction documents, submitted permit <br />applications, provided bidding assistance, construction <br />observation, and construction contract administration. The <br />lift stations are identified as PS-02 (Woodlands), PS-06, <br />(Fountainview), PS-08 (Mediterranean), and PS-14 (Pretty) <br />for 2017. The 2018 lift stations are identified as Woodhaven, <br />PS-33 Waterside, PS-31 Florida Mango, and PS-15 Haverhill <br />Court <br /> <br />CONTACT INFO <br />Kimberly Glas-Castro, Planning, <br />Zoning & Building Director <br />Village of Palm Springs <br />226 Cypress Lane <br />Palm Springs, FL 33461 <br />P: (561) 434-5086 <br />kglas-castro@vpsfl.org <br /> <br />PROJECT INFO <br />Completed: Ongoing <br />Duration: Ongoing <br />Fees: $242,000 <br />Change orders: None <br /> <br />Personnel: <br />Lisa A. Tropepe, P.E. <br />Adam C. Swaney, P.E. <br />Richard Brown, E.I. <br />Jennifer Malin, P.S.M., <br />Adam Beck <br />C. Andre Rayman, P.S.M. <br /> <br /> <br />90