My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Type here] <br /> <br />WELLINGTON WATER TREATMENT PLANT <br />WELLINGTON, FL <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DESCRIPTION <br /> <br />Engenuity Group Performed the Following Services for this <br />Project: <br />Boundary and Topographic Surveys were performed in three <br />different sections. <br />Section 1 (Outlined in red) <br /> Boundary Survey of property <br /> Location and Topographic Survey <br />Section 2 (Outlined in yellow) <br /> Topographic Survey <br />Section 3 (Outline in blue) <br /> Topographic Survey <br /> Tree Survey <br /> <br /> <br />CONTACT INFO <br />Shannon LaRocque <br />Utilities Director <br />Village of Wellington <br />12300 Forest Hill Blvd <br />Wellington, FL 33414 <br />slarocque@wellingtonfl.gov <br /> <br />PROJECT INFO <br />Completed: 2017 <br />Duration: 3 months <br />Fees: $22,858.50 <br />Construction Cost: <br />N/A <br /> <br />Change orders: None <br />Personnel: <br />C. Andre Rayman, P.S.M. <br />Jennifer Malin, P.S.M., <br />Joseph Williams, <br />Adam Beck <br /> <br /> <br />92
The URL can be used to link to this page
Your browser does not support the video tag.