12. NAME 113. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Steven A. Harrison, P.G., _avironmental Engineering: QA/QC a. TOTALb. WITH CURRENT FIRM
<br />MRSA I Reviewer/Senior Mold Assessor 31 1 6.5
<br />15. FIRM NAME AND LOCATION Ci and State
<br />Terracon Consultants, Inc. ( Fort Lauderdale, FL )
<br />16. EDUCATION DEGREE AND SPECIALIZATION 17. CURRENT PROFESSIONAL REGISTRATION STATE AND DISCIPLINE
<br />M.S./Marine Geology and Geophysics B.S./Geology I Florida/Professional Geologist Florida/Mold Assessor
<br />18. OTHER PROFESSIONAL QUALIFICATIONS iPublications, Organizations Training- Awards etc.
<br />Certification: 8 -Hr Hazmat Health and Safety Training Updates (Current) 40 -Hr Hazmat Health and Safety Training (1989)
<br />• RELEVANT PROJECTS
<br />111 TITLE AND LOCATION (City and State! 1 (2) YEAR COMPLETED
<br />.3� BRIEF DESCRIPTION (Briefscope, size, cost etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />d. Project Director/Senior Geologist. From 2015 through 2019, Steven provided technical oversight for multiple projects conducted
<br />as part of the City's Assessment Grant. Sites ranged from vacant parcels to a former borrow pit that served as an illegal landfill.
<br />Services included Programmatic tasks to manage the Grant, preparation a Quality Assurance Project Plan (QAPP) and Site-
<br />specific (SS)-QAPPS, Phase I ESAs, asbestos and lead paint surveys, Phase II ESAs, and performance of preliminary geotechnical
<br />evaluation to understand construction considerations for the site. Terracon secured a grant extension from the EPA to provide time
<br />for additional site investigation . Firm's Fee: $382,000
<br />STANDARD FORM 330 (REV. 8/2016) 48
<br />Former Sears, Pompano Citicentre Mall PROFESSIONAL SERVICES CONSTRUCTION If a licable'
<br />Pompano Beach, FL On N/A
<br />13 BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if ro'ect performed with current firm
<br />Project Director. Site assessment efforts identified impacted groundwater that resulted from historical operations in the area of the
<br />former dispenser island that extended across the eastern parking area and beneath the east end of the Autocenter building. A
<br />combined site assessment report/remedial action plan (SAR/RAP) incorporated assessment findings and remediation details into
<br />a•
<br />one document to expedite the regulatory process. The aggressive remedial strategy addressed residual soil impacts, along with
<br />groundwater exceedances through source removal of saturated soils impacted with petroleum hydrocarbons, air sparging of
<br />groundwater within the open excavation to volatilize dissolved petroleum hydrocarbons, placement of oxidation chemicals (ISCO)
<br />into soil during backfilling, and injection of oxidation chemicals (ISCO) beneath the excavation and into the surrounding areas of
<br />groundwater impacts. Terracon completed field efforts within 30 days from receipt of approval from Broward County Environmental
<br />Protection and Growth Management Department (BCEPGMD). ISCO is continuing to remediate petroleum hydrocarbons dissolved
<br />in groundwater and monitoring will verify progress of the remedial effort. Upon completion of one year of post active remediation
<br />monitoring, the site will obtain regulatory closure without conditions. Firm's Fee: $550,000
<br />11 TITLE AND LOCATION CP3 and State; 2 YEAR COMPLETED
<br />Former Sabal Golf Remediation PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Pompano Beach, FL 2019 N/A
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.: AND SPECIFIC ROLE Check if project performed with current firm
<br />b
<br />Project Director. The Former Sabal Golf Course is an 11 -acre remnant of the golf course that is planned for redevelopment into a
<br />recreational use property (Sports Park). Terracon conducted a 9,600 -ton (non -hazardous) soil source removal project. We managed
<br />all subcontractors, coordinated all field activities, documented daily activities, conducted air monitoring, and coordinated logistics
<br />associated with the field project. Timely completion of field work required daily project and safety meetings, with daily field reports.
<br />QA/QC procedures were implemented through all aspects of the project. Firm's Fee: $896,724
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Central Parking Garage, Riverwalk Center
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (If applicable)
<br />2019
<br />N/A
<br />Fort Lauderdale, FL
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.l AND SPECIFIC ROLE ® Check if project performed with current firm
<br />Project Director. Terracon performed a Phase I ESA consistent with the procedures included in ASTM El 527-13, to assist the client
<br />C.
<br />in developing information to identify recognized environmental conditions (RECs) in connection with the site. This was achieved
<br />through review of user -provided information, a regulatory database, historical and physical records, interviews, including
<br />government inquiries, as applicable, and a reconnaissance of the site and adjoining properties. The ESA reported that the site was
<br />redeveloped numerous times during its history and sites, which utilized regulated compounds, were located throughout the study
<br />area. Firm's Fee: $2,799
<br />1) TITLE AND LOCATION (City and State), (2) YEAR COMPLETED
<br />City of Opa-Locka Brownfields Grant PROFESSIONAL SERVICES CONSTRUCTION Ifo licable
<br />Opa-Locka, FL 2019 N/A
<br />.3� BRIEF DESCRIPTION (Briefscope, size, cost etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />d. Project Director/Senior Geologist. From 2015 through 2019, Steven provided technical oversight for multiple projects conducted
<br />as part of the City's Assessment Grant. Sites ranged from vacant parcels to a former borrow pit that served as an illegal landfill.
<br />Services included Programmatic tasks to manage the Grant, preparation a Quality Assurance Project Plan (QAPP) and Site-
<br />specific (SS)-QAPPS, Phase I ESAs, asbestos and lead paint surveys, Phase II ESAs, and performance of preliminary geotechnical
<br />evaluation to understand construction considerations for the site. Terracon secured a grant extension from the EPA to provide time
<br />for additional site investigation . Firm's Fee: $382,000
<br />STANDARD FORM 330 (REV. 8/2016) 48