Laserfiche WebLink
12. NAME 113. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Steven A. Harrison, P.G., _avironmental Engineering: QA/QC a. TOTALb. WITH CURRENT FIRM <br />MRSA I Reviewer/Senior Mold Assessor 31 1 6.5 <br />15. FIRM NAME AND LOCATION Ci and State <br />Terracon Consultants, Inc. ( Fort Lauderdale, FL ) <br />16. EDUCATION DEGREE AND SPECIALIZATION 17. CURRENT PROFESSIONAL REGISTRATION STATE AND DISCIPLINE <br />M.S./Marine Geology and Geophysics B.S./Geology I Florida/Professional Geologist Florida/Mold Assessor <br />18. OTHER PROFESSIONAL QUALIFICATIONS iPublications, Organizations Training- Awards etc. <br />Certification: 8 -Hr Hazmat Health and Safety Training Updates (Current) 40 -Hr Hazmat Health and Safety Training (1989) <br />• RELEVANT PROJECTS <br />111 TITLE AND LOCATION (City and State! 1 (2) YEAR COMPLETED <br />.3� BRIEF DESCRIPTION (Briefscope, size, cost etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />d. Project Director/Senior Geologist. From 2015 through 2019, Steven provided technical oversight for multiple projects conducted <br />as part of the City's Assessment Grant. Sites ranged from vacant parcels to a former borrow pit that served as an illegal landfill. <br />Services included Programmatic tasks to manage the Grant, preparation a Quality Assurance Project Plan (QAPP) and Site- <br />specific (SS)-QAPPS, Phase I ESAs, asbestos and lead paint surveys, Phase II ESAs, and performance of preliminary geotechnical <br />evaluation to understand construction considerations for the site. Terracon secured a grant extension from the EPA to provide time <br />for additional site investigation . Firm's Fee: $382,000 <br />STANDARD FORM 330 (REV. 8/2016) 48 <br />Former Sears, Pompano Citicentre Mall PROFESSIONAL SERVICES CONSTRUCTION If a licable' <br />Pompano Beach, FL On N/A <br />13 BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if ro'ect performed with current firm <br />Project Director. Site assessment efforts identified impacted groundwater that resulted from historical operations in the area of the <br />former dispenser island that extended across the eastern parking area and beneath the east end of the Autocenter building. A <br />combined site assessment report/remedial action plan (SAR/RAP) incorporated assessment findings and remediation details into <br />a• <br />one document to expedite the regulatory process. The aggressive remedial strategy addressed residual soil impacts, along with <br />groundwater exceedances through source removal of saturated soils impacted with petroleum hydrocarbons, air sparging of <br />groundwater within the open excavation to volatilize dissolved petroleum hydrocarbons, placement of oxidation chemicals (ISCO) <br />into soil during backfilling, and injection of oxidation chemicals (ISCO) beneath the excavation and into the surrounding areas of <br />groundwater impacts. Terracon completed field efforts within 30 days from receipt of approval from Broward County Environmental <br />Protection and Growth Management Department (BCEPGMD). ISCO is continuing to remediate petroleum hydrocarbons dissolved <br />in groundwater and monitoring will verify progress of the remedial effort. Upon completion of one year of post active remediation <br />monitoring, the site will obtain regulatory closure without conditions. Firm's Fee: $550,000 <br />11 TITLE AND LOCATION CP3 and State; 2 YEAR COMPLETED <br />Former Sabal Golf Remediation PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Pompano Beach, FL 2019 N/A <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.: AND SPECIFIC ROLE Check if project performed with current firm <br />b <br />Project Director. The Former Sabal Golf Course is an 11 -acre remnant of the golf course that is planned for redevelopment into a <br />recreational use property (Sports Park). Terracon conducted a 9,600 -ton (non -hazardous) soil source removal project. We managed <br />all subcontractors, coordinated all field activities, documented daily activities, conducted air monitoring, and coordinated logistics <br />associated with the field project. Timely completion of field work required daily project and safety meetings, with daily field reports. <br />QA/QC procedures were implemented through all aspects of the project. Firm's Fee: $896,724 <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Central Parking Garage, Riverwalk Center <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (If applicable) <br />2019 <br />N/A <br />Fort Lauderdale, FL <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.l AND SPECIFIC ROLE ® Check if project performed with current firm <br />Project Director. Terracon performed a Phase I ESA consistent with the procedures included in ASTM El 527-13, to assist the client <br />C. <br />in developing information to identify recognized environmental conditions (RECs) in connection with the site. This was achieved <br />through review of user -provided information, a regulatory database, historical and physical records, interviews, including <br />government inquiries, as applicable, and a reconnaissance of the site and adjoining properties. The ESA reported that the site was <br />redeveloped numerous times during its history and sites, which utilized regulated compounds, were located throughout the study <br />area. Firm's Fee: $2,799 <br />1) TITLE AND LOCATION (City and State), (2) YEAR COMPLETED <br />City of Opa-Locka Brownfields Grant PROFESSIONAL SERVICES CONSTRUCTION Ifo licable <br />Opa-Locka, FL 2019 N/A <br />.3� BRIEF DESCRIPTION (Briefscope, size, cost etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />d. Project Director/Senior Geologist. From 2015 through 2019, Steven provided technical oversight for multiple projects conducted <br />as part of the City's Assessment Grant. Sites ranged from vacant parcels to a former borrow pit that served as an illegal landfill. <br />Services included Programmatic tasks to manage the Grant, preparation a Quality Assurance Project Plan (QAPP) and Site- <br />specific (SS)-QAPPS, Phase I ESAs, asbestos and lead paint surveys, Phase II ESAs, and performance of preliminary geotechnical <br />evaluation to understand construction considerations for the site. Terracon secured a grant extension from the EPA to provide time <br />for additional site investigation . Firm's Fee: $382,000 <br />STANDARD FORM 330 (REV. 8/2016) 48 <br />