My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Terracon Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Terracon Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:40:13 AM
Creation date
8/21/2020 10:36:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. <br />1-rI ^ AND LO <br />Vacant Parcel <br />Aventura, FL <br />YEAR COMPLETED <br />2015 f N/A <br />3 BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Project Manager. Phase II ESA reported that the suspected presence of a historical lumberyard, rail line and telephone pole storage <br />area at the site, resulted in the presence of impacted soil and groundwater. Site assessment efforts estimated the extent of soil and <br />groundwater impacts affected with arsenic, polynuclear aromatic hydrocarbons, and volatile organic compounds (VOCs). <br />Remedial/source removal efforts included the excavation and disposal of approximately 1,500 tons of arsenic impacted soils, and <br />groundwater was monitored to verify that the residual concentrations were stable. A background study found that groundwater <br />impacts were attributed to a sub -regional impact in the surrounding area. A Site-specific Health and Safety Plan (SS -HASP), dust <br />control plan, erosion control plan and soil management plan were prepared to assist the site development contractor with <br />requirements of working within an impcated site. Air monitoring was also conducted to assess for airborne contaminants within and <br />adjacent to the site. Groundwater monitoring has verified that groundwater impacts are stable and the site will be provided a "NFAC" <br />status as part of the site closure. The site will be redeveloped and returned to use after sitting idle for many years. Firm's Fee: <br />$200,000 <br />STANDARD FORM 330 (REV. 8/2016) 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.