Laserfiche WebLink
12. NAME 113. ROLE IN THIS CONTRACT 114. YEARS EXPERIENCE <br />Terrence Horan, P.E. environmental r-nglneer- Assistant Project Ia. TOTAL b. WITH CURRENT <br />Manager/Senior Environmental Engineer 1 27 11.5 <br />15. FIRM NAME AND LOCATION Ci[ and State <br />Terracon Consultants Inc. West Palm Beach, FL <br />16. EDUCATION DEGREE AND SPECIALIZATION 17. CURRENT PROFESSIONAL REGISTRATION STATE AND DISCIPLINE <br />B.S./Environmental Engineering Florida/Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etch <br />Certifications: OSHA 40 -hour Hazardous Waste Operations & Emergency Response (HAZWOPER) <br />11) TITLE AND LOCATION ICrty and State] <br />(2) YEAR COMPLETED <br />Project Manager. The Former Sabal Golf Course is an 11 -acre remnant of the golf course that is planned for redevelopment into a <br />e' recreational use property (Sports Park). Terracon conducted a 9,600 -ton (non -hazardous) soil source removal project. We managed <br />all subcontractors, coordinated all field activities, documented daily activities, conducted air monitoring, and coordinated logistics <br />associated with the field project. We ensured timely completion of field work using coordinated daily and weekly project and safety <br />meetings, and prepared daily field reports. The firm verified that project -specific QA/QC procedures were implemented through all <br />aspects of the project. Firm's Fee: $896,724 <br />STANDARD FORM 330 (REV. 8/2016) 50 <br />Former Sears, Pompano Citicentre Mall PROFESSIONAL SERVICES CONSTRUCTION If a licable <br />Pompano Beach FL Ongoing INIA <br />3 BRIEF DESCRIPTION Briefscope, size, cost, etc.. AND SPECIFIC ROLE ® Check if roject performed with current firm <br />Project Manager. Site assessment efforts identified impacted groundwater that resulted from historical operations in the area of the <br />former dispenser island that extended across the eastern parking area and beneath the east end of the Autocenter building. A <br />combined SAR/RAP incorporated assessment findings and remediation details into one document to expedite the regulatory <br />a. <br />process. The aggressive remedial strategy addressed residual soil impacts, along with groundwater exceedances through source <br />removal of saturated soils impacted with petroleum hydrocarbons, air sparging of groundwater within the open excavation to volatilize <br />dissolved petroleum hydrocarbons, placement of oxidation chemicals (ISCO) into soil during backfilling, and injection of oxidation <br />chemicals (ISCO) beneath the excavation and into the surrounding areas of groundwater impacts. Terracon completed field efforts <br />within 30 days from receipt of approval from BCEPGMD. ISCO is continuing to remediate petroleum hydrocarbons dissolved in <br />groundwater and monitoring will verify progress of the remedial effort. Upon completion of one year of post active remediation <br />monitoring, the site will obtain regulatory closure without conditions. Firm's Fee: $550.000 <br />f 1 TITLE AND LOCATION (Cify and Statel 2 YEAR COMPLETED <br />Northwood Anchor Brownfields Site <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />West Palm Beach, FL <br />2020 <br />N/A <br />'3; BRIEF DESCRIPTION ;Brief scope, size, cost, etc.) AND SPECIFIC ROLE IN Check if project erformed with current firm <br />Senior Environmental Engineer. In early 2016, Terracon was retained by the West Palm Beach Community Redevelopment Agency <br />b. <br />(CRA) to perform cleanup through a loan obtained through Palm Beach County's Revolving Loan Fund (RLF) Program including <br />programmatic tasks and active remediation. The programmatic tasks included preparation of a SS-QAPP, Davis -Bacon Act reporting <br />assistance, community outreach and preparation of an Analysis of Brownfields Cleanup Alternatives (ABCA). Air sparge and soil <br />vapor extraction (AS/SVE) was selected as the remedial technology and upon receipt of FDEP approval of the RAP, remedial system <br />construction was initiated. Remediation at the Northwood Anchor site is currently ongoing with routine monitoring of the remedial <br />operations and an interim source removal (ISR) to address residual impacts. Firm's Fee: $326,500 <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Sahar Petroleum PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />Belle Glade, FL 2019 N/A <br />(3) BRIEF DESCRIPTION (grief scope, size, cost, etc. AND SPECIFIC ROLE ® Check if projeCt performed with current firm <br />c. <br />Senior Environmental Engineer. The approximately 0.8 -acre site functions as a vehicle fueling station with a convenience store that <br />maintained two 8,000 -gallon underground storage tanks (LISTS) for unleaded gasoline and diesel fuel. Terracon reviewed historical <br />site information and conducted a limited site assessment, which included a pre -drill site meeting, utility clearance, off-site access, <br />soil and groundwater sampling, and investigative derived waste disposal. Based on analytical data, the FDEP placed the site on <br />hold for future funding. Firm's Fee: $22,858 estimated <br />1 TITLE AND LOCATION (City and State;2 <br />YEAR COMPLETED <br />PFAS Assessment of Miami Dade College Academy of Fire Science PROFESSIONAL SERVICES CONSTRUCTION 1f a licable <br />Miami, FL 1 2019 1 N/A <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.J AND SPECIFIC ROLE ® Check if project performed with current firm <br />d• <br />Senior Engineer. From 2019 to the present, Terracon has been providing assessment services to the MDCFA at a firefighter training <br />area that historically utilized AFFF that contained PFAS. Terracon has conducted soil and groundwater sampling for PFAS, including <br />installation of shallow and intermediate depth monitoring wells. Initial groundwater results reported PFAS concentrations above the <br />alternative GCTLs, and Terracon is conducting additional groundwater assessment and modeling for the site. Firm's Fee: $35,000 <br />1 TITLE AND LOCATION (Cily and State <br />2 YEAR COMPLETED <br />Former Sabal Golf Remediation <br />PROFESSIONAL SERVICES CONSTRUCTION If applicable.) <br />2019 1N/A <br />Pompano Beach, FL <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Project Manager. The Former Sabal Golf Course is an 11 -acre remnant of the golf course that is planned for redevelopment into a <br />e' recreational use property (Sports Park). Terracon conducted a 9,600 -ton (non -hazardous) soil source removal project. We managed <br />all subcontractors, coordinated all field activities, documented daily activities, conducted air monitoring, and coordinated logistics <br />associated with the field project. We ensured timely completion of field work using coordinated daily and weekly project and safety <br />meetings, and prepared daily field reports. The firm verified that project -specific QA/QC procedures were implemented through all <br />aspects of the project. Firm's Fee: $896,724 <br />STANDARD FORM 330 (REV. 8/2016) 50 <br />