|
12. NAME 113. ROLE IN THIS CONTRACT 1 14. YtAKS tAFtKItlVGt
<br />Rutu Nulkar, P.E. jeotechnical Service Project Manager 12. TOTAL b. WITH CURRENT FIRM
<br />16 1 16
<br />15. FIRM NAME AND LOCATION (City and State
<br />Terracon Consultants, Inc. Fort Lauderdale, FL
<br />B.S./Civil Engineering 1professional Engineer/Florida, Civil Engineering
<br />18. OTHER PROFESSIONAL QUALIFICATIONS Publications. Organizations. Training. Awards, etc.
<br />Affiliations: American Society of Civil Engineers Florida Engineering Society
<br />Geo -Institute Association of State Dam Safety Officials
<br />19. RELEVANT RROJECTS
<br />!11 TIT! F ANn I OCATION rCi+e and State) 1 (2) YEAR COMPLETED
<br />Project Engineer. WASD planned to renovate the seawall that existed at the time of Terracon's services due to signs of deterioration
<br />e• along the southeast edge. Pavement areas were also showing signs of heavy deterioration with holes found in the asphalt. Subsurface
<br />exploration, laboratory testing, and geotechnical engineering recommendations related to the design and construction of the seawall
<br />modifications were provided. Information and geotechnical engineering recommendations relative to subsurface and groundwater
<br />conditions, geotechnical engineering parameters for the design of the new seawall, construction considerations, and hydraulic
<br />conductivity of the existing soils. Firm's Fee - $25,593
<br />STANDARD FORM 330 (REV. 8/2016) 55
<br />I-95 Express Lanes Phase 313-1 D/B Project, FDOT District 4 PROFESSIONAL SERVICES
<br />JC6NSTRUCTION 'Ifa licable
<br />N/A
<br />Broward and Palm Beach Counties, FL Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (K Check if project Rerformed with current firm
<br />Geotechnical Project Manager. The project extends from South of SW 10th Street to South of Glades Road and includes converting the
<br />existing HOV lanes to HOT and widening that will result in two tolled Express Lanes in each direction. The improvements, will result in
<br />a'
<br />the roadway widening, two bridge widenings and one bridge replacement, MSE wall and sound barrier wall construction. In addition,
<br />there will be miscellaneous cantilever and overhead sign structures. As a member of the D/B team, Terracon has been performing soil
<br />exploration, geotechnical classification laboratory testing, standard foundation studies. The firm is currently involved in post design
<br />services for 36-1. Firm's Fee: $631,565 estimated. Terracon is also providing CQC services for the Contractor, Prince Contracting, LLC.
<br />The scope of work includes soils testing for embankment and walls, concrete testing for drilled shafts and bridge decks, auger cast pile
<br />testing, and PDA testing. Firm's Fee: $620,696 estimated
<br />1 TITLE AND LOCATION fCity and State) (2) YEAR COMPLETED
<br />City of Lauderhill Police Station PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Lauderhill, FL 2019 N/A
<br />i3! BRIEF DESCRIPTION IBriefscope, size, cost, etc. AND SPECIFIC ROLE F, Check if project performed with current firm
<br />b.
<br />Senior Geotechnical Engineer. The proposed new building includes a 3- to 5 -story police building measuring approximately 55 feet by
<br />110 feet. Terracon performed subsurface exploration and geotechnical engineering services to provide information and geotechnical
<br />engineering recommendations relative to: subsurface conditions; groundwater conditions; site preparation and earthwork; excavation
<br />considerations; foundation design and construction; floor slab design and construction; pavement design and construction; and hydraulic
<br />conductivity (k -value). Terracon is currently in the process of preparing the report for the client, the City of Lauderhill. Firm's Fee: $6,400
<br />estimated _
<br />(1) TITLE AND LOCATION (City and State) u _ (2) YEAR COMPLETED
<br />48 -inch Diameter Water Main Downtown Loop Closure PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable)
<br />Miami, FL 2018 N/A
<br />!3) BRIEF DESCRIPTION iBriefscope, size, cost, etc. AND SPECIFIC ROLE ® Check if project performed with current firm
<br />C.
<br />Project Engineer. The 48 -inch diameter water main will be constructed under railroad tracks and roadway at the Miami Loop, along
<br />NW 12th Street between NW 1 st Avenue West and NW 1 st Avenue East. Terracon provided geotechnical exploration services including
<br />drilling borings. The purpose of these services was to provide subsurface field exploration, laboratory testing information, and
<br />geotechnical engineering recommendations to assist in the design and construction of the water main. Firm's Fee: $11,987
<br />1 TITLE AND LOCATION (City and State 2 YEAR COMPLETED
<br />NCL CT B, PortMiami PROFESSIONAL SERVICES CONSTRUCTIONIfa licable
<br />Miami, FL 2017 N/A
<br />13� BRIEF DESCRIPTION iBriefscope, size, cost etcJ AND SPECIFIC ROLE ® Check if project performed with current firm
<br />d.
<br />Senior Engineer. The project includes a new CT building and six -story parking garage with associated port infrastructure. The new
<br />terminal is located on Dodge Island along the northern end of the port. Terracon performed geotechnical exploration to evaluate the
<br />subsurface conditions at the project site and provided geotechnical engineering data relative to the geotechnical site characterization
<br />information including subsurface soil/rock conditions, earthwork, floor slab design and construction, pavement design and construction,
<br />groundwater conditions, and foundation design and construction. Firm's Fee: $59,087
<br />1 TITLE AND LOCATION (City and State)
<br />2 YEAR COMPLETED
<br />Seawall Evaluation at Pump Station 1 Facility, Miami -Dade WASD
<br />PROFESSIONAL SERVICES I
<br />CONSTRUCTION tlfa licable
<br />2017
<br />N/A
<br />Miami, FL
<br />(3) BRIEF DESCRIPTION (Briefscqpe, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm
<br />Project Engineer. WASD planned to renovate the seawall that existed at the time of Terracon's services due to signs of deterioration
<br />e• along the southeast edge. Pavement areas were also showing signs of heavy deterioration with holes found in the asphalt. Subsurface
<br />exploration, laboratory testing, and geotechnical engineering recommendations related to the design and construction of the seawall
<br />modifications were provided. Information and geotechnical engineering recommendations relative to subsurface and groundwater
<br />conditions, geotechnical engineering parameters for the design of the new seawall, construction considerations, and hydraulic
<br />conductivity of the existing soils. Firm's Fee - $25,593
<br />STANDARD FORM 330 (REV. 8/2016) 55
<br />
|