Laserfiche WebLink
12. NAME 113. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jaime Velez, P.E. Geotechnical Service Senior Geotechnical a. TOTAL b. WITH CURRENT FIRM <br />Enqineer 17 16 <br />15. FIRM NAME AND LOCATION (City and State <br />Terracon Consultants, Inc. - West Palm Beach, FL <br />16. EDUCATION DEGREE AND SPECIALIZATION 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE <br />B.S./Civil Engineednq M.E./ Engineering I Professional Engineer/Florida, Civil Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS Publications Organizations. Training Awards. etc. <br />Additional Training: During Post Graduate Studies, Performed Research: Use of the Cone Penetrometer in Testing of Cemented Sands. <br />University of FL <br />e. Staff Geotechnical Engineer. Canal 29 borders the western side of the Cascades development within the City of Lauderhill, Florida. The <br />eastern canal bank has failed in several areas along this reach. The City of Lauderhill wanted to stabilize this canal bank in order to <br />limit the potential for future erosion and to reduce required future maintenance. We assisted A.D.A. Engineering, Inc. with the design <br />of the canal bank stabilization measures in the area of geotechnical engineering. Dunkelberger completed geotechnical exploration <br />and laboratory testing related to the design of the project. Firm's Fee: $20,300 <br />STANDARD FORM 330 (REV. 8/2016) 56 <br />... I E mi well I W-40 <br />1 TITLE AND LOCATION Cir and State 2 YEAR COMPLETED <br />South Florida Water Management District (SFWMD) C-43 West Basin PROFESSIONAL SERV17 <br />CONSTRUCTION ffa olicablei <br />N/A <br />Storage Reservoir (WBSR) 2019 <br />Hendry County, FL <br />T� <br />(3) BRIEF DESCRIPTION •:Bfiefscqpe, size, cost etc.) AND SPECIFIC ROLE ® Check if project verformed with current firm <br />a. <br />Project Engineer. The Town of Palm Beach planned to replace overhead wires (power, cable and phone) along the roadways within <br />three specific areas. The overhead lines will be replaced with new underground lines that will bear less than 10 feet below the pavement <br />grade (usually at about 3 feet deep). Terracon provided a geotechnical study and recommendations pertaining to subsoils that require <br />removal (if any), excavations, dewatering, pipe bedding, backfill materials, and compaction requirements. The firm's field <br />testing/exploration program included obtaining underground utility clearance and right-of-way (ROW) permits, drilling Standard <br />Penetration Test (SPT) borings, core samples, and maintenance of traffic (MOT) plan. Firm's Fee: $9,500 <br />1 TITLE AND LOCATION (City and State <br />2 YEAR COMPLETED <br />1North Springs Improvement District (NSID) Pump Station No. 3 PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) <br />Broward County, FL 2018 N/A <br />(3) BRIEF DESCRIPTION 0 ief scope, size, cost, etc./ AND SPECIFIC ROLE ® Check if project performed with current firm <br />b• <br />Senior Geotechnical Engineer. The NSID planned to construct a stormwater pump station at the north end of the NSID R/W Canal, <br />approximately 100 feet south of Loxahatchee Road. The pump station would be used to transport water from the RNV Canal to the <br />Hillsboro Canal. Terracon performed geotechnical engineering services and provided geotechnical engineering recommendations <br />relative to the design and construction of pile foundations based on the pump station building loads and other design aspects. Firm's <br />Fee: $3,345 <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Canal Bank Stabilization Project, Coral Springs Improvement District PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) <br />(CSID) 2016 N/A <br />Coral Springs, FL <br />C. <br />(3) BRIEF DESCRIPTION (Briefscoue, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Project Engineer. Five canal bank locations were identified within the CSID for evaluation of bank stabilization. These locations had <br />experienced severe erosion and/or instability and require remedial action. The firm completed a geotechnical evaluation and provided <br />planning level recommendations and design criteria related to the geotechnical aspects of the work. Firm's Fee: $7,195 <br />1 TITLE AND LOCATION fCify and State) 2 YEAR COMPLETED <br />Runway 9R -27L Expansion, Fort Lauderdale -Hollywood International PROFESSIONAL SERVICES CONSTRUCTION If a licable <br />Airport (FLL) 2014 N/A <br />Broward County, FL <br />3 BRIEF DESCRIPTION Brief scope, size, cost, etc.: AND SPECIFIC ROLE ® Check if project performed with current firm _ <br />Project Engineer. Runway 9R -27L was being expanded from 5,276 feet to 8,000 feet to accommodate the increasing demand at FLL. <br />d. <br />Ground modification work was required for the MSE retaining wall system as part of the $791 million expansion project that was <br />scheduled to be operational by September 2014. Some of the MSE walls would be located west of U.S. Highway 1 (US 1) while others <br />would be located east of US 1. Two ground modification methods were used beneath the MSE retaining wall system: (1) deep mixing <br />wherein cement was admixed with the fine grained and organic soils to render them stronger and less compressible than they pre- <br />existed; and (2) dynamic densification to compact deposits of loose granular materials. Dunkelberger Engineering & Testing, now a <br />Terracon Company, provided geotechnical consultation/support services for the MSE retaining wall system to the Odebrecht Central <br />team. Firm's Fee: $166,081 <br />f 11 TITLE AND LOCATION (City and State 2I YEAR COMPLETED <br />Canal 29 Bank Stabilization Project PROFESSIONAL SERVICES CONSTRUCTION W a licable <br />City of Lauderhill, FL 2011 N/A <br />�I BRIEF DESCRIPTION (Brief sco :e, size, cost etc.) AND SPECIFIC ROLE ®_ Check if project performed with current firm <br />e. Staff Geotechnical Engineer. Canal 29 borders the western side of the Cascades development within the City of Lauderhill, Florida. The <br />eastern canal bank has failed in several areas along this reach. The City of Lauderhill wanted to stabilize this canal bank in order to <br />limit the potential for future erosion and to reduce required future maintenance. We assisted A.D.A. Engineering, Inc. with the design <br />of the canal bank stabilization measures in the area of geotechnical engineering. Dunkelberger completed geotechnical exploration <br />and laboratory testing related to the design of the project. Firm's Fee: $20,300 <br />STANDARD FORM 330 (REV. 8/2016) 56 <br />