|
12. NAME 113. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Nicholas Mata, P.E. Geotechnical Services: Assistant Project a. TOTAL b. WITH CURRENT FIRM
<br />Manager/Project Geotechnical Engineer 1 12 3
<br />15. FIRM NAME AND LOCATION (City and State
<br />Terracon Consultants, Inc. (Fort Lauderdale, FL)
<br />16. EDUCATION DEGREE AND SPECIALIZATION 17. CURRENT PROFESSIONAL REGISTRATION STATE AND DISCIPLINE)
<br />M.S./Geotechnical Engineering B.S./Civil Engineering JProfessional Engineer/Florida, Civil Engineering
<br />19. OTHER PROFESSIONAL QUALIFICATIONS Publications, Organizations, Training. Awards etc.
<br />Affiliations: American Society of Civil Engineers (ASCE)
<br />PROJECTS19. RELEVANT
<br />!11 TITI F AND I OCATION [r.Ov and State/ 1 (2) YEAR COMPLETED
<br />e Geotechnical Engineer. The project includes a new CT building and six -story parking garage with associated port infrastructure.
<br />The new terminal is located on Dodge Island along the northern end of the port. Terracon performed geotechnical exploration to
<br />evaluate the subsurface conditions at the project site and provided geotechnical engineering data relative to the geotechnical site
<br />characterization information including subsurface soil/rock conditions, earthwork, floor slab design and construction, pavement
<br />design and construction, groundwater conditions, and foundation design and construction. Finn's Fee: $59,087
<br />STANDARD FORM 330 (REV. 8/2016) 57
<br />James Bradley Park Improvements IPROFESSIONAL SERVICES1
<br />CONSTRUCTION ;lfa, licable.
<br />N/A
<br />Lauderhill, FL 2019
<br />(31 BRIEF DESCRIPTION Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm
<br />a.
<br />Project Manager. Terracon conducted subsurface exploration and geotechnical engineering services for the proposed James
<br />Bradley Park Improvements project to be located at 3100 NW 16th Street in City of Lauderhill, Broward County. The purpose of
<br />these services was to provide information and geotechnical engineering recommendations relative to subsurface soil conditions,
<br />groundwater conditions, foundation design and construction, and site preparation and earthwork. Firm's Fee: $4,350
<br />i 1 TITLE AND LOCATION lCity.and State _
<br />2 YEAR COMPLETED
<br />Nova Southeastern University (NSU) Residence Hall
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (if applicable)
<br />Davie, FL
<br />2019
<br />1 N/A
<br />3 BRIEF DESCRIPTION Briefscope, size, cost, etc.) AND SPECIFIC ROLE N Check if project performed with current fine
<br />Project Engineer. Mako Hall is a new 7 -story, inverted "C" shaped residence hall building with a 2 -story amenity building, outdoor
<br />b
<br />courtyard amenity space, and a parking lot. Terracon conducted geotechnical exploration that included advancement of soil test
<br />borings performed within the proposed building footprint to a depth of 50 feet below the existing ground surface. The purpose of
<br />these services is to provide information and preliminary geotechnical engineering recommendations relative to the proposed
<br />development, including subsurface conditions, groundwater conditions, and laboratory test results. Work was completed under a
<br />continuing services contract the firm holds with NSU. Firm's Fee: $ 244,055
<br />J
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />_
<br />City of Lauderhill Police Station
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (if applicable)
<br />Lauderhill, FL
<br />2019
<br />NIA
<br />{3) BRIEF DESCRIPTION (Brief sco e, size, cost, etc.) AND SPECIFIC ROLE N Check if project performed with current firm
<br />c.
<br />Project Engineer. The proposed new building includes a three- to five -story police building. Terracon performed subsurface
<br />exploration and geotechnical engineering services to provide information and geotechnical engineering recommendations relative
<br />to: subsurface conditions; groundwater conditions; site preparation and earthwork; excavation considerations; foundation design
<br />and construction; floor slab design and construction; pavement design and construction; and hydraulic conductivity (k -value). Firm's
<br />Fee: $6,400 estimated
<br />1 TITLE AND LOCATION City and State
<br />2 YEAR COMPLETED
<br />Lauderhill Sports Complex
<br />PROFESSIONAL SERVICES1 CONSTRUCTION (1fayclicabW
<br />2018 N/A
<br />Lauderhill, FL
<br />3) BRIEF DESCRIPTION ,.Briefscope, size, cost, etc.) AND SPECIFIC ROLE N Check if project performed with current firm
<br />Senior Geotechnical Engineer. A new scoreboard is proposed for the north end -zone of the football field at Lauderhill Sports Park
<br />d
<br />located at 7500 West Oakland Park Boulevard, in the City of Lauderhill. Terracon's geotechnical scope of work included the
<br />advancement of a soil test boring to depth of 30 feet below the existing ground surface, and exfiltration tests to a depth of 10 feet
<br />below ground surface. The purpose of these services was to provide information and geotechnical engineering recommendations
<br />relative to the proposed development including subsurface conditions, groundwater conditions, exfiltration test results, and
<br />recommendations for foundation support for the proposed project. Firm's Fee: $4,800
<br />1 TITLE AND LOCATION Ci.l. and Stater 2 YEAR COMPLETED
<br />NCL CT B, PortMiami
<br />PROFESSIONAL SERVICES1
<br />CONSTRUCTION 1f a licable
<br />2017
<br />NIA
<br />Miami, FL
<br />(3) BRIEF DESCRIPTION ;Brief scope, size, cost, etc.) AND SPECIFIC ROLE N Check if ro'ect performed with current firm J
<br />e Geotechnical Engineer. The project includes a new CT building and six -story parking garage with associated port infrastructure.
<br />The new terminal is located on Dodge Island along the northern end of the port. Terracon performed geotechnical exploration to
<br />evaluate the subsurface conditions at the project site and provided geotechnical engineering data relative to the geotechnical site
<br />characterization information including subsurface soil/rock conditions, earthwork, floor slab design and construction, pavement
<br />design and construction, groundwater conditions, and foundation design and construction. Finn's Fee: $59,087
<br />STANDARD FORM 330 (REV. 8/2016) 57
<br />
|