My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Terracon Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Terracon Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:40:13 AM
Creation date
8/21/2020 10:36:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. EXAMPLE PROJECT KEY NUMBER <br />(Present as many projects requested by - o ..Wxj,-,.jt not specinet 10 <br />Complete one ..- <br />ClllCl.11111%.Q1 JCI V WGJ <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Keystone Park PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />North Miami, FL 2016, 2017 N/A <br />PROJECT23. •WNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME POINT OF CONTACT TELEPHONE NUMBER <br />City of North Miami Derrick Corker, CPRD (305) 895-9846 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Keystone Park is located at the NW corner of Ixora Court and Ixora Lane in North Miami, Florida. At the time of our services, <br />the site (playground) was covered by a rubber mat and occupied with playground equipment and landscaping. Subsurface <br />exploration and geotechnical recommendations were provided by Terracon to remediate the depression on the playground <br />at the park. The purpose of these geotechnical engineering services was to provide information and geotechnical <br />engineering recommendations relative to subsurface soil and bedrock conditions; groundwater conditions; identification of <br />unsuitable/problematic soil conditions; and recommendations for soil remediation. Services were completed in 2016. <br />Terracon also performed earthwork observations and construction materials engineering and testing services during <br />construction of the Keystone playground play surface replacement project. Terracon provided staff engineers and <br />engineering technicians to perform field earthwork observations of the removal of unsuitable soils in the playground area <br />and replacement with suitable structural fill soils. Field technicians were provided to collect bulk samples of existing and/or <br />imported fill soils and transport them to Terracon's laboratory for analyses. During placement of the structural fill, our <br />technicians visited the site equipped with a nuclear gauge to perform in-place density tests to verify the degree of <br />compaction. At the completion of the earthwork observations and testing services, Terracon issued a written report <br />documenting the construction activities the firm monitored. Services commenced in 2017. <br />Firm's Fees: $15,662 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />a. 1rermcon Miami Lakes, FL <br />C. <br />(1) FIRM NAME I(2) FIRM LOCATION (City and State) <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) <br />(3) ROLE <br />Prime Consultant <br />(3) ROLE <br />(3) ROLE <br />(1) FIRM NAME I(2) FIRM LOCATION (City and State) (3) ROLE <br />STANDARD FORM 330 (REV. 8/2016) 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.