My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Terracon Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Terracon Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:40:13 AM
Creation date
8/21/2020 10:36:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />Hugo Soto, P.E. <br />Lucas Barroso-Giachetti, <br />P.E., CHMM <br />Steven A. Harrison, P.G., <br />MRSA <br />Terrence Horan, P.E. <br />Tom Holley, CHMM, CIH, <br />CSP, FLAC, MRSA <br />Sergio Adasme, MRSA I Environmental Engineer: <br />Industrial Hygiene Project <br />Manager/Project Industrial <br />Hygienist/Senior Inspector <br />Geotechnical Services: Project <br />Manager <br />Geotechnical Services: Senior <br />Geotechnical Engineer <br />Geotechnical Services: <br />Assistant Project <br />Manager/Project Geotechnical <br />Engineer <br />Geotechnical Services: Project <br />Geotechnical (PDA) Engineer <br />I <br />I <br />1 28. EXAMPLE PROJECTS LISTED IN SECTION F <br />27. ROLE IN THIS <br />i(Fill in "Example Projects Key" section below before completing table. <br />i CONTRACT <br />Place "X" under project key number for participation in same or <br />(From Section E, Block) <br />similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Environmentai cngmeering: <br />Padr6n Campus <br />NCL Terminal B and 6 -story Parking Garage <br />1-95 Express Lanes and Ramp Signals, Phase <br />Principal -in -Charge (PIC) <br />X X X X X <br />Geotechnical Services: <br />PIC/QA/QC Reviewer <br />Environmental Engineering: <br />X X X <br />Contract/Project Manager <br />3A-2,1-95 from North of Commercial Boulevard to <br />Environmental Engineering: <br />X X <br />X X <br />QA/QC Reviewer/Senior Mold <br />4 <br />Central District Wastewater Treatment Plant <br />Assessor <br />(WWTP) <br />Environmental Engineer: <br />X <br />X <br />Assistant Project <br />Pompano Beach Airpark — Plane Crash Fuel Spill <br />10 <br />Keystone Park <br />Manager/Senior Environmental <br />Source Removal <br />STANDARD FORM 330 (REV. 8/2016) 70 <br />Engineer <br />Environmental Engineer: Senior <br />X <br />X <br />X <br />CIH/QA/QC Reviewer <br />Rutu Nulkar, P.E. <br />Jaime Velez, P.E. <br />Nicholas Mata, P.E. <br />Mitchell Foster, P.E <br />X <br />i X i X i <br />X <br />X X <br />NO. <br />X <br />X X <br />Miami Dade College Fire Academy <br />6 <br />I <br />X <br />NO. <br />TITLE OF EXAMPLE PROJECT <br />NO. <br />TITLE OF EXAMPLE PROJECT <br />1 <br />Miami Dade College Fire Academy <br />6 <br />Campus Building 6 Renovation, Eduardo J. <br />Padr6n Campus <br />NCL Terminal B and 6 -story Parking Garage <br />1-95 Express Lanes and Ramp Signals, Phase <br />2 <br />Interior Renovation Asbestos Survey at PortMiami <br />7 <br />3 <br />Former Sabal Golf Remediation <br />8 <br />3A-2,1-95 from North of Commercial Boulevard to <br />South of SW 10th Street <br />Ma Hall <br />4 <br />Central District Wastewater Treatment Plant <br />9 <br />(WWTP) <br />5 <br />Pompano Beach Airpark — Plane Crash Fuel Spill <br />10 <br />Keystone Park <br />Source Removal <br />STANDARD FORM 330 (REV. 8/2016) 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.