|
Reviewed plans for permit compliance. Processed and released Public Works Right-of-Way Permit to city-awarded
<br />contractor. Managed right-of-way inspections throughout Biscayne Point Island, Biscayne Beach and Stillwater Drive sub-
<br />neighborhoods, which involved water main and service replacement, stormwater drainage installation, roadway
<br />reconstruction replacement of subbase, sidewalk replacement, curb and gutter installation, decorative street lighting,
<br />landscaping and irrigation service connection.
<br />f.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />North Shore Dickens Avenue American Recovery Reinvestment North Shore Dickens Avenue American Recovery Reinvestment North Shore Dickens Avenue American Recovery Reinvestment North Shore Dickens Avenue American Recovery Reinvestment
<br />Act, Miami BeachAct, Miami BeachAct, Miami BeachAct, Miami Beach, Florida , Florida , Florida , Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2011 2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Managed right-of-way inspections involving milling and resurfacing, constructing new sidewalks, curb and gutters at site-
<br />specific locations, constructing paver crosswalks and building landscape bulb-outs, and restriping and signage for bike
<br />lane. Reviewed and approved irrigation water service connection. Reviewed plans for permit compliance. Processed and
<br />released Public Works Right-of-Way Permit to city-awarded Contractor.
<br />g.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Natiivo, MiamiNatiivo, MiamiNatiivo, MiamiNatiivo, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Civil engineering and environmental permitting for proposed high-rise development, consisting of 192 hotel rooms, 412
<br />apartments, 136,396 sf of office space and 8,260 sf of retail space. Provided inspection services for water and sanitary sewer
<br />facilities plan review and assisted in processing permits through Miami-Dade County Department of Water and Sewer
<br />(WASD).
<br />h.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Parco Mare, Dania BeachParco Mare, Dania BeachParco Mare, Dania BeachParco Mare, Dania Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present Present
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided inspection services for construction of a hotel/lodge with parking within 2.17 acres of land that includes .81 acre of
<br />jurisdictional wetlands. On-site mitigation of restoring and enhancing existing wetland.
<br />i.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />South Pointe Crosswalks, Miami BeachSouth Pointe Crosswalks, Miami BeachSouth Pointe Crosswalks, Miami BeachSouth Pointe Crosswalks, Miami Beach PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2012 2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Managed right-of-way inspections for the construction of new brick paver crosswalk in the South Pointe neighborhood of
<br />Miami Beach. Reviewed and approved irrigation water service connection for the landscape improvements. Reviewed plans
<br />for permit compliance. Processed and released Public Works Right-of-Way Permit to city-awarded contractor.
<br />j.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Vizcaya of Kendall Community Development District, KendallVizcaya of Kendall Community Development District, KendallVizcaya of Kendall Community Development District, KendallVizcaya of Kendall Community Development District, Kendall, , , ,
<br />FloridaFloridaFloridaFlorida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project management services for proposed traffic calming enhancement improvements, which included radar speed check
<br />signs, Rectangular Rapid Flashing Beacons (RRFB), speed humps, and pavement striping at crosswalks. Attended Board
<br />of Supervisors monthly meetings to advise on status of Miami-Dade County plan review processes.
<br />k.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />William’s Island Marina, AventuraWilliam’s Island Marina, AventuraWilliam’s Island Marina, AventuraWilliam’s Island Marina, Aventura, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present Present
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided construction administration services for marina improvements consisting of installation of 338 lf of 4’ HDPE fire line
<br />suppression and redesign of 18 slips. Designed the extension of the concrete base and access platform.
<br />
<br />Page 32
|