Laserfiche WebLink
a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Bayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Providing site civil engineering and environmental permitting services for proposed 20-acre park comprised of lake, walking <br />trails, boardwalks and promenade. Lake design incorporates the treatment of stormwater runoff for surrounding <br />neighborhood. Designed outfalls and conducted stormwater modeling. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Boca Chica Mooring Field, Monroe CountyBoca Chica Mooring Field, Monroe CountyBoca Chica Mooring Field, Monroe CountyBoca Chica Mooring Field, Monroe County, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineering design and environmental permitting for of public mooring field for 40 vessels, ranging 30 - 40 ft, anchored <br />with an eco-mooring device. Design of navigational channel. <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Everglades Safari Park, Miami, FloridaEverglades Safari Park, Miami, FloridaEverglades Safari Park, Miami, FloridaEverglades Safari Park, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineering design and environmental permitting of 3-acre park improvements to adapt to water level rise. Design elements <br />include ticket gazebo, waiting area, floating docks, fuel systems, potable water system, parking lot improvements, drainage <br />restoration and pedestrian access bridge. <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />First Presbyterian Church, Miami, FloridaFirst Presbyterian Church, Miami, FloridaFirst Presbyterian Church, Miami, FloridaFirst Presbyterian Church, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil and shoreline stabilization design of baywalk and 220 feet of seawall. <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />James L. James L. James L. James L. Knight Center, MiamiKnight Center, MiamiKnight Center, MiamiKnight Center, Miami, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Engineering design and environmental permitting of 500 feet of bulkhead replacement. Design involves a transient docking <br />facility, bumpers and fender piles, and cleat replacements. <br />f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Maceo Park, MiamiMaceo Park, MiamiMaceo Park, MiamiMaceo Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Marine engineering design and environmental permitting and for improvements to boat ramp, fixed wooden docks, floating <br />dock, kayak launch, riprap repair and regrading parking lot. <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Maurice Gibb Memorial Park, Miami Beach, FloridaMaurice Gibb Memorial Park, Miami Beach, FloridaMaurice Gibb Memorial Park, Miami Beach, FloridaMaurice Gibb Memorial Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Carfedlen ReyesCarfedlen ReyesCarfedlen ReyesCarfedlen Reyes Civil EngineerCivil EngineerCivil EngineerCivil Engineer a. TOTAL b. WITH CURRENT FIRM <br />19 2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Coastal Systems International, Coral Gables, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL <br />REGISTRATION (STATE AND <br />DISCIPLINE) <br /> <br />Bachelor of Science, Civil Engineering, Universidad Santa Maria la Antigua, Panama, 2006 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Carfedlen “Carl” Reyes, with over 19 years of experience in computer-aided design (CAD) for civil, coastal and marine <br />engineering, serves as a CAD Designer and Civil Engineer. He conducts and interprets hydraulic models, and applies the results <br />for water, wastewater and stormwater projects. He regularly provides CAD support to project engineers by conducting coastal <br />process studies, including numerical modeling. He extracts various data sets, bathymetry, and prepares report figures for <br />engineering studies and reports. Carl has extensive experience completing civil works design within the CAD environment utilizing <br />the latest versions of AutoCAD. He has training and experience with the use of AutoCAD Civil 3D to prepare coastal plans, <br />plan/profiles, and to calculate earthworks (cut/fill) for coastal and marine projects. Carl regularly coordinates with other consultants <br />on project teams including mechanical, electrical, landscape/architectural engineers to prepare and compile comprehensive <br />construction documents. He has been responsible for CAD and management of CAD files and drawings for more than $2 billion <br />in civil works projects, both locally and internationally. <br />19. RELEVANT PROJECTS <br />Page 35