Laserfiche WebLink
Civil design, planning, permitting of 2-acre waterfront park. Design elements include living shoreline, seawall, overwater <br />viewing platform and MONSTRUM playground. Designed waterfront improvements including bulkhead, overlook and <br />fishing pier. Designed foundation for playground equipment and shade structures. <br />h. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Marine Stadium Marine Stadium Marine Stadium Marine Stadium Restoration, Miami, FloridaRestoration, Miami, FloridaRestoration, Miami, FloridaRestoration, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil/marine engineering for repair of existing concrete columns, new pile installation, retaining walls, floating and fixed <br />docks, excavation/fill activities, barge mooring structures and infrastructure design for historical outdoor waterfront <br />stadium. <br />i <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miamarina Miamarina Miamarina Miamarina –––– Pier 5, MiamiPier 5, MiamiPier 5, MiamiPier 5, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Marine engineering design and environmental permitting for proposed pier extension. Design of new dock replacing part <br />of existing structure. <br />j. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Myers Park, MiamiMyers Park, MiamiMyers Park, MiamiMyers Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Marine engineering, environmental permitting and field investigations for boat ramp facility improvements, seawall <br />replacement, floating dock and baywalk. <br />k. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Playa Largo Ocean Playa Largo Ocean Playa Largo Ocean Playa Largo Ocean Residences, Key LargoResidences, Key LargoResidences, Key LargoResidences, Key Largo, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Marine engineering, environmental permitting and field investigations for waterfront and marine improvements for a multi- <br />family development. Design of shoreline stabilization, elevated boat ramps, seawall and wooden docks. <br />l. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Rickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, Miami----Dade Dade Dade Dade <br />County, FloridaCounty, FloridaCounty, FloridaCounty, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil/coastal design for recreational development involving 9.6 acres of shoreline stabilization and upland facility. New <br />parking lot and roadway and excavation/fill activities, stormwater improvements, sheet pile installation, retaining walls, <br />beach access, revetment and jetties. <br />m. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />SE 25th Road Street End, MiamiSE 25th Road Street End, MiamiSE 25th Road Street End, MiamiSE 25th Road Street End, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil/marine engineering for 100-ft seawall replacement, floating dock and baywalk. Field investigations conducted and <br />environmental permits processed. Bidding assistance and construction administration services to be provided. <br /> <br />Page 36