|
a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Bal Harbour Village Park, Bal Bal Harbour Village Park, Bal Bal Harbour Village Park, Bal Bal Harbour Village Park, Bal HarbourHarbourHarbourHarbour, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Marine engineering design of shoreline associated with waterfront park. Design of new elevated sheet pile seawall installation,
<br />wooden dock, kayak launch, outfall extensions with manatee grates, and baywalk. Performed structural assessment of seawall
<br />and dock.
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />CityCityCityCity----wide Seawall Assessments, West Palm Beachwide Seawall Assessments, West Palm Beachwide Seawall Assessments, West Palm Beachwide Seawall Assessments, West Palm Beach, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural assessments of 7 miles of existing bulkhead to determine remaining useful life and propose repair/replacement
<br />solutions.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Currie Park, West Palm BeachCurrie Park, West Palm BeachCurrie Park, West Palm BeachCurrie Park, West Palm Beach, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Marine engineering, environmental consulting and construction administration services for design of staging dock,
<br />deteriorated boat ramp and maintenance dredging.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />First Presbyterian Church, MiamiFirst Presbyterian Church, MiamiFirst Presbyterian Church, MiamiFirst Presbyterian Church, Miami, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 Present
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Shoreline stabilization design and environmental permitting of 220 feet of seawall and bulkhead. Civil design of City baywalk.
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Haulover Beach Park, North Miami BeachHaulover Beach Park, North Miami BeachHaulover Beach Park, North Miami BeachHaulover Beach Park, North Miami Beach, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Marine engineering design and environmental permitting of 20,000-sf concrete boat ramp and 3,200 sf of floating docks.
<br />f.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Hillsboro Inlet District South Jetty Restoration, Broward CountyHillsboro Inlet District South Jetty Restoration, Broward CountyHillsboro Inlet District South Jetty Restoration, Broward CountyHillsboro Inlet District South Jetty Restoration, Broward County, , , ,
<br />FloridaFloridaFloridaFlorida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Marine engineering design for breakwater structure replacement consisting of 400 feet of sheet pile and 1,020 tons of riprap.
<br />Field investigations conducted, environmental permits obtained, bidding, and construction administration services provided.
<br />
<br />g.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />James L. Knight Center, MiamiJames L. Knight Center, MiamiJames L. Knight Center, MiamiJames L. Knight Center, Miami, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />
<br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Mahsa Kamali, Ph.D.Mahsa Kamali, Ph.D.Mahsa Kamali, Ph.D.Mahsa Kamali, Ph.D. Structural EngineerStructural EngineerStructural EngineerStructural Engineer a. TOTAL b. WITH CURRENT FIRM
<br />5 1
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Coastal Systems International, Coral Gables, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION
<br />(STATE AND DISCIPLINE)
<br />PE Structural (Exam passed,
<br />Application in process), CA
<br />
<br />Doctor of Philosophy, Structural Engineering, University of Miami, Coral Gables,
<br />Florida, 2017
<br />Bachelor of Science, Civil Engineering, Sharif University of Technology, Tehran, Iran,
<br />2013
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. Kamali has over five years of research and design experience in the civil and structural engineering fields. Prior to joining Coastal
<br />Systems, Ms. Kamali was a research assistant at University of Miami specialized in green construction, sustainable concrete
<br />materials and simulations using finite element analysis for complex structural systems. Before starting her Ph.D. program, Ms.
<br />Kamali worked as a structural engineer intern in a structural design company.
<br />
<br />As a structural engineer at Coastal Systems, Ms. Kamali is responsible for feasibility studies, engineering calculations and design,
<br />preparation of construction plans and specifications, field investigations and construction administration on a variety of projects that
<br />include marinas, shoreline stabilization and marine structures.
<br />19. RELEVANT PROJECTS
<br />Page 37
|