|
Engineering design and environmental permitting of 500 feet of bulkhead replacement. Design involves a transient docking
<br />facility, bumpers and fender piles, and cleat replacements.
<br />
<br />h.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Kennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Performed the field inspection and prepared a structural assessment report for the existing boardwalk.
<br />Responsible for design of a new boardwalk to replace the existing structure.
<br />
<br />i.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Marine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Performed the field inspection and prepared a structural assessment report for the existing seawall.
<br />Responsible for design of structural repairs of the existing piles supporting the seaward portion of the stadium.
<br />j.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Maurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami Beach, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design, planning, permitting of 2-acre waterfront park. Designed proposed waterfront improvements, including the bulkhead,
<br />overlook and fishing pier. Designed foundation for playground equipment and shade structures.
<br />
<br />k.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Miamarina Miamarina Miamarina Miamarina –––– Pier 5, MiamiPier 5, MiamiPier 5, MiamiPier 5, Miami, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Marine engineering design and environmental permitting for proposed pier extension. Design of new dock replacing part of
<br />existing structure. Provided bidding assistance and construction administration.
<br />
<br />l.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Myers Park, MiamiMyers Park, MiamiMyers Park, MiamiMyers Park, Miami, Florida, Florida, Florida, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Present N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Marine engineering, environmental permitting and field investigations for boat ramp facility improvements, seawall
<br />replacement, floating dock and baywalk.
<br />
<br />Page 38
|