Laserfiche WebLink
Engineering design and environmental permitting of 500 feet of bulkhead replacement. Design involves a transient docking <br />facility, bumpers and fender piles, and cleat replacements. <br /> <br />h. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Kennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Performed the field inspection and prepared a structural assessment report for the existing boardwalk. <br />Responsible for design of a new boardwalk to replace the existing structure. <br /> <br />i. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Marine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Performed the field inspection and prepared a structural assessment report for the existing seawall. <br />Responsible for design of structural repairs of the existing piles supporting the seaward portion of the stadium. <br />j. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Maurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami Beach, Florida, Florida, Florida, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Design, planning, permitting of 2-acre waterfront park. Designed proposed waterfront improvements, including the bulkhead, <br />overlook and fishing pier. Designed foundation for playground equipment and shade structures. <br /> <br />k. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miamarina Miamarina Miamarina Miamarina –––– Pier 5, MiamiPier 5, MiamiPier 5, MiamiPier 5, Miami, Florida, Florida, Florida, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Marine engineering design and environmental permitting for proposed pier extension. Design of new dock replacing part of <br />existing structure. Provided bidding assistance and construction administration. <br /> <br />l. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Myers Park, MiamiMyers Park, MiamiMyers Park, MiamiMyers Park, Miami, Florida, Florida, Florida, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Marine engineering, environmental permitting and field investigations for boat ramp facility improvements, seawall <br />replacement, floating dock and baywalk. <br /> <br />Page 38