Laserfiche WebLink
a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Avalon Shores Sewage Pump Avalon Shores Sewage Pump Avalon Shores Sewage Pump Avalon Shores Sewage Pump Station, MarylandStation, MarylandStation, MarylandStation, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Prepared construction drawings and contract specifications for civil, mechanical and electrical improvements. Managed <br />construction administration for the civil, mechanical and electrical improvements to the Avalon Shores SPS including review <br />of shop drawings and responding to RFIs. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Bal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal Harbour,,,, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Marine engineering design of shoreline associated with waterfront park. Design of new elevated sheet pile seawall <br />installation and wooden dock. <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Coastal Inundation & Economic Coastal Inundation & Economic Coastal Inundation & Economic Coastal Inundation & Economic Vulnerability Study, Bal Vulnerability Study, Bal Vulnerability Study, Bal Vulnerability Study, Bal <br />HarbouHarbouHarbouHarbourrrr,,,, FloridaFloridaFloridaFlorida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2020 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Assessment of Village’s vulnerability to sea level rise and storm surge. Performing economic impact assessment of the <br />cost of “doing nothing.” Prepared vulnerability and economic assessment report. <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Elkton West Sanitary Sewer Mill Run Service Area, MarylandElkton West Sanitary Sewer Mill Run Service Area, MarylandElkton West Sanitary Sewer Mill Run Service Area, MarylandElkton West Sanitary Sewer Mill Run Service Area, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Designed a gravity sewer system for the Elkton West Sanitary Sewer Area. <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Haulover Haulover Haulover Haulover Beach ParkBeach ParkBeach ParkBeach Park MarinaMarinaMarinaMarina, North Miami Beach, North Miami Beach, North Miami Beach, North Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Marine engineering design and environmental permitting of 20,000-sf concrete boat ramp and 3,200 sf of floating docks. <br />Prepared associated construction drawings and cost estimate. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Emily ProsserEmily ProsserEmily ProsserEmily Prosser Jr. Project ManagerJr. Project ManagerJr. Project ManagerJr. Project Manager a. TOTAL b. WITH CURRENT FIRM <br />5 1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Coastal Systems International, Coral Gables, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL <br />REGISTRATION (STATE AND <br />DISCIPLINE) <br /> <br />Bachelor of Science, Environmental Engineering, Johns Hopkins University <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Emily Prosser, with over 5 years of civil and environmental design experience, serves as a Jr. Project Manager at Coastal Systems. <br />Emily is responsible for feasibility studies, engineering calculations and design, preparation of construction plans and <br />specifications, field investigations and construction administration on a variety of projects that include marinas, shoreline <br />stabilization and marine structures. Her responsibilities include planning, coordination, and management of civil projects. <br /> <br />Prior to joining Coastal Systems, Emily worked as a project engineer, specializing in municipal water and wastewater systems. <br />She prepared and coordinated engineering drawings and design specifications for projects including potable water distribution, <br />sanitary sewer collection, and sewage pump stations and wastewater treatment plant improvements. She conducted site visits <br />for design and construction, and led condition assessments for stormwater facilities. <br /> <br />Emily oversaw projects and supporting staff to ensure design and deliverables were on time and within scope. Tasks included <br />forecasting future estimated costs, tracking budgets, invoicing, and reviewing contract documents for quality assurance. She also <br />performed construction administration including submittal review, requests for information (RFI) responses, and facilitated design <br />and construction meetings with clients, contractors, and engineers to ensure the success of completed projects. <br /> <br />CertificationsCertificationsCertificationsCertifications <br />NASSCO Pipeline, Manhole, and Lateral Assessment Certification Program (PACP, MACP, and LACP) <br />Virginia DEQ Stormwater Management Inspector <br />OSHA 10 Hour Construction Training <br />19. RELEVANT PROJECTS <br />Page 41