Laserfiche WebLink
f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Haulover Beach ParkHaulover Beach ParkHaulover Beach ParkHaulover Beach Park MarinaMarinaMarinaMarina Sea Level Rise Study, North Sea Level Rise Study, North Sea Level Rise Study, North Sea Level Rise Study, North <br />Miami BeachMiami BeachMiami BeachMiami Beach, Florida, Florida, Florida, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Prepared evaluation of sea level rise impacts to existing boat ramp facility infrastructure. Provided design recommendations <br />based on modeling analysis results. <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Little Elk Creek Force Main, MarylandLittle Elk Creek Force Main, MarylandLittle Elk Creek Force Main, MarylandLittle Elk Creek Force Main, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Designed and prepared contract drawings for a dual 14” force main from a proposed pump station and an existing <br />wastewater treatment plant. Developed permit drawings and applications for agency review. <br />h. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Miamarina Miamarina Miamarina Miamarina –––– Pier 5, MiamiPier 5, MiamiPier 5, MiamiPier 5, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Marine engineering design and environmental permitting for proposed pier extension. Prepared contract drawings for dock <br />improvements that included new concrete beams, piles, decking and rerouting of dock utilities. <br />i. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Myers Park, MiamiMyers Park, MiamiMyers Park, MiamiMyers Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil/marine engineering, environmental permitting and field investigations for boat ramp facility improvements, seawall <br />replacement, floating dock and baywalk. <br />j. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Natiivo, MiamiNatiivo, MiamiNatiivo, MiamiNatiivo, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil engineering and environmental permitting for proposed high-rise development. Prepared NPDES documents. <br />k. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Pennsylvania Avenue and Conway Wastewater Pumping Pennsylvania Avenue and Conway Wastewater Pumping Pennsylvania Avenue and Conway Wastewater Pumping Pennsylvania Avenue and Conway Wastewater Pumping <br />Stations, VirginiaStations, VirginiaStations, VirginiaStations, Virginia <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Designed site and mechanical alternatives using hydraulic calculations, client input, and industry standards for two <br />pumping stations in a series of 8 stations to be replaced. Wrote design memo based on site visits, design constraints, and <br />operator input to be used for standardization of future city pump station replacements and upgrades. <br />l. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />South Kent Island Sanitary Project Phase 1, MarylandSouth Kent Island Sanitary Project Phase 1, MarylandSouth Kent Island Sanitary Project Phase 1, MarylandSouth Kent Island Sanitary Project Phase 1, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Designed over 30,000 linear feet of pressure sewer mains, assessing conflicts with existing utilities and environmentally <br />sensitive areas. <br />m. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Sunrise Park, Hallandale BeachSunrise Park, Hallandale BeachSunrise Park, Hallandale BeachSunrise Park, Hallandale Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil engineering and environmental permitting for proposed park improvements. Prepared NPDES documents. <br />p. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Water Systems Master Plan and Model, MarylandWater Systems Master Plan and Model, MarylandWater Systems Master Plan and Model, MarylandWater Systems Master Plan and Model, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Provided recommendations for 10-year capital improvement programs by analyzing alternatives for water treatment plant <br />layouts and tank design based on future design flow, cost estimates, permitting, and client input. <br /> <br />Page 42